APPLICATION OF TABU SEARCH FOR SOLVING THE BI-OBJECTIVE WAREHOUSE PROBLEM IN A FUZZY ENVIRONMENT

نویسندگان

  • Amit Kumar School of Mathematics and Computer Applications, Thapar University, Patiala-147004, India
  • Anila Gupta School of Mathematics and Computer Applications, Thapar Univer- sity, Patiala-147004, India
  • Mahesh Kumar Sharma School of Mathematics and Computer Applications, Thapar University, Patiala-147004, India
چکیده مقاله:

The bi-objective warehouse problem in a crisp environment is often not eective in dealing with the imprecision or vagueness in the values of the problem parameters. To deal with such situations, several researchers have proposed that the parameters be represented as fuzzy numbers. We describe a new algorithm for fuzzy bi-objective warehouse problem using a ranking function followed by an application of tabu search. The method is illustrated on a numerical example, demonstrating the eectiveness of the tabu search method. Numerical results are compared for both fuzzy and crisp versions of the problem.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

application of tabu search for solving the bi-objective warehouse problem in a fuzzy environment

the bi-objective warehouse problem in a crisp environment is often not eective in dealing with the imprecision or vagueness in the values of the problem parameters. to deal with such situations, several researchers have proposed that the parameters be represented as fuzzy numbers. we describe a new algorithm for fuzzy bi-objective warehouse problem using a ranking function followed by an applic...

متن کامل

A Tabu Search Method for a New Bi-Objective Open Shop Scheduling Problem by a Fuzzy Multi-Objective Decision Making Approach (RESEARCH NOTE)

This paper proposes a novel, bi-objective mixed-integer mathematical programming for an open shop scheduling problem (OSSP) that minimizes the mean tardiness and the mean completion time. To obtain the efficient (Pareto-optimal) solutions, a fuzzy multi-objective decision making (fuzzy MODM) approach is applied. By the use of this approach, the related auxiliary single objective formulation can...

متن کامل

the algorithm for solving the inverse numerical range problem

برد عددی ماتریس مربعی a را با w(a) نشان داده و به این صورت تعریف می کنیم w(a)={x8ax:x ?s1} ، که در آن s1 گوی واحد است. در سال 2009، راسل کاردن مساله برد عددی معکوس را به این صورت مطرح کرده است : برای نقطه z?w(a)، بردار x?s1 را به گونه ای می یابیم که z=x*ax، در این پایان نامه ، الگوریتمی برای حل مساله برد عددی معکوس ارانه می دهیم.

15 صفحه اول

Solving a bi-objective project capital budgeting problem using a fuzzy multi-dimensional knapsack

In this paper, the researchers have proposed a multi-dimensional knapsack model for project capital budgeting problem in uncertain situation which has been modeled through fuzzy sets. The optimistic and pessimistic situations were considered and associated deterministic models were yielded. Numerical example has been supplied toillustrate the performance of proposed model. The results were prom...

متن کامل

Solving a bi-objective location routing problem by a NSGA-II combined with clustering approach: application in waste collection problem

It is observed that the separated design of location for depots and routing for servicing customers often reach a suboptimal solution. So, solving location and routing problem simultaneously could achieve better results. In this paper, waste collection problem is considered with regard to economic and societal objective functions. A non-dominated sorting genetic algorithm (NSGA-II) is used to l...

متن کامل

Solving a bi-objective manpower scheduling problem considering the utility of objective functions

This paper presents a novel bi-objective manpower scheduling problem that minimizes the penalty resulted from employees’ assignment at lower skill levels than their real skill and maximizes employees’ utility for working at a special skill level in some shifts or on some days. Employees are classified in two specialist groups and three skill levels in each specialization. In addition, the prese...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 9  شماره 1

صفحات  1- 19

تاریخ انتشار 2012-02-10

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023