Critical Path Method for Flexible Job Shop Scheduling Problem with Preemption
نویسندگان
چکیده مقاله:
This paper addressed a Flexible Job shop Scheduling Problem (FJSP) with the objective of minimization of maximum completion time (Cmax) which job splitting or lot streaming is allowed. Lot streaming is an important technique that has been used widely to reduce completion time of a production system. Due to the complexity of the problem; exact optimization techniques such as branch and bound algorithm will lose their efficiency at medium and large dimensions. Thus, metaheuristic techniques are good options in order to obtain high quality solutions within a reasonable computational time. In this study, firstly, the considered problems are solved in both permitted and not permitted of lot streaming by means of memetic algorithm and then the obtained solutions will be improved by using the critical path method heuristic. The numerical results indicate the high efficiency of the memetic algorithm in comparison with the previous methods; in addition, adding preemption and using allowable idle machines have led to a considerable improvement in the objective function.
Download for Free
Sign up for free to access the full text
Sign up - It's Free!اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودمنابع مشابه
Solving Flexible Job Shop Scheduling with Multi Objective Approach
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...
متن کاملFlexible job shop scheduling under availability constraints
In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...
متن کاملSingle Objective Evolutionary Algorithm for Flexible Job-shop Scheduling Problem
A meta-heuristic approach for solving the flexible job-shop scheduling problem (FJSP) is presented in this study. This problem consists of two sub-problems, the routing problem and the sequencing problem and is among the hardest combinatorial optimization problems. We propose a Evolutionary Algorithm (EA) for the FJSP. Our algorithm uses several different rules for generating the initial popula...
متن کاملMultiobjective Artificial Immune Algorithm for Flexible Job Shop Scheduling Problem
Flexible Job shop scheduling is very important in production management and combinatorial optimization. It is NP-hard problem and consists of two sub-problems: sequencing and assignment. Multiobjective Flexible Job-Shop Scheduling Problems (MFJSSP) is formulated as three-objective problem which minimizes completion time (makespan), critical machine workload and total work load of all machines. ...
متن کاملGenetic algorithm for the flexible job-shop scheduling problem
In this paper, we propose a new optimization technique, the hierarchical multi-space competitive distributed genetic algorithm (HmcDGA), which is effective for the hierarchical optimization problem. It is an extension of the multi-space competitive distributed genetic algorithm (mcDGA), which was proposed by the authors. The mcDGA efficiently finds an optimal solution with a low computational c...
متن کاملIterative Flattening Search for the Flexible Job Shop Scheduling Problem
This paper presents a meta-heuristic algorithm for solving the Flexible Job Shop Scheduling Problem (FJSSP). This strategy, known as Iterative Flattening Search (IFS), iteratively applies a relaxationstep, in which a subset of scheduling decisions are randomly retracted from the current solution; and a solving-step, in which a new solution is incrementally recomputed from this partial schedule....
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ذخیره در منابع من قبلا به منابع من ذحیره شده{@ msg_add @}
عنوان ژورنال
دوره 30 شماره 2
صفحات 261- 269
تاریخ انتشار 2017-02-01
با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023