Energy Scheduling in Power Market under Stochastic Dependence Structure

نویسنده

  • Mehdi Farhadkhani Electricity Economics & Energy Research Group, Niroo Research Institute (NRI),Tehran, Iran
چکیده مقاله:

Since the emergence of power market, the target of power generating utilities has mainly switched from cost minimization to revenue maximization. They dispatch their power energy generation units in the uncertain environment of power market. As a result, multi-stage stochastic programming has been applied widely by many power generating agents as a suitable tool for dealing with self-scheduling strategies under uncertainty. However, dependence structure between stochastic variables has been almost ignored in the literature. Copula function is a new concept in the probability and statistics field which has the capability to represent the dependence structure among stochastic variables. However, Copula function has recently taken into account in power system studies by some articles. In this article, self-scheduling strategy of a generation utility owning thermal units is investigated while the dependence structure among stochastic load and market price variables is taking into account. We assume that the generation utility is a price-taker agent in a power market, and it also has to meet the load of a specific region as a retailer. The results indicates that as the stochastic dependence structure among load and price variables is considered in modeling load and price scenarios, the output of unit commitment problem changes so that the revenue of generation utility increases.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

energy scheduling in power market under stochastic dependence structure

since the emergence of power market, the target of power generating utilities has mainly switched from cost minimization to revenue maximization. they dispatch their power energy generation units in the uncertain environment of power market. as a result, multi-stage stochastic programming has been applied widely by many power generating agents as a suitable tool for dealing with self-scheduling...

متن کامل

Two-Stage Stochastic Day-Ahead Market Clearing in Gas and Power Networks Integrated with Wind Energy

The significant penetration rate of wind turbines in power systems made some challenges in the operation of the systems such as large-scale power fluctuations induced by wind farms. Gas-fired plants with fast starting ability and high ramping can better handle natural uncertainties of wind power compared to other traditional plants. Therefore, the integration of electrical and natural gas syste...

متن کامل

Scheduling Under Power and Energy Constraints

Given a system model where machines have distinct speeds and power ratings but are otherwise compatible, we consider various problems of scheduling under resource constraints on the system which place the restriction that not all machines can be run at once. These can be power, energy, or makespan constraints on the system. Given such constraints, there are problems with divisible as well as no...

متن کامل

Considering Effect of Energy Market on Reactive Power Market

In this paper, a new structure for reactive power market is presented. Considering reactive power losses caused by active power flow in the reactive power market is the main purpose of this paper. Hence, this study tries to improve reactive power market and create fair competition in reactive power generation.

متن کامل

Commitment of Electric Power Generators Under Stochastic Market Prices

A formulation for the commitment of electric power generators under a deregulated electricity market is proposed. The problem is expressed as a stochastic optimization problem in which the expected profits are maximized while meeting demand and standard operating constraints. First, we show that when an electric power producer has the option of trading electricity at market prices, an optimal u...

متن کامل

Test Scheduling for Minimal Energy Consumption under Power Constraints

Power consumption has become a crucial concern in built-in self-test (BIST) due to the increased switching activity in the circuit under test. In this paper we present a method for scheduling tests which aims at minimizing total energy consumption and test application time under peak power constraints. In contrast to previous approaches, our method takes into account switching activity which oc...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 04  شماره 04

صفحات  203- 209

تاریخ انتشار 2015-12-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023