Risk Management Plan in Large Urban Projects

نویسندگان

  • Saeed Khodaverdi
چکیده مقاله:

One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So this paper investigates the implementation of risk management plan in large urban projects through a case study, namely Imam Ali highway. To do this, first some generic information is discussed in each section and then it is tried to show how incorporate it in the project studied. According to qualitative analysis done, the issues of obstacles, weak feasibility studies, and inadequacies of resources (scaffolding & forming material) were the main risk factors of the project. In another effort, using Monte Carlo Simulation, the quantitative analysis was done on some outputs of qualitative analysis, and numerical probabilities to achieve scheduled finishing date of the project were obtained.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Risk Management in Construction Projects

The financial and economic crisis has had an adverse impact on the Lithuania’s economy and construction industry. The GDP of Lithuania grew slightly in 2010, in contrast to a decrease of 14.7% in 2009. Lithuania’s GDP increased from 1.3% in 2010 to 4.6% in 2011. Annual GDP growth decreased from its highest point of 6.7%, reached in the third quarter, to 4.4% in the last quarter of 2011 [1,2]. S...

متن کامل

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

Risk Management for Contractors in Marine Projects

V. W. Y. Tam · L. Y. Shen · Risk Management for Contractors in Marine Projects ... · pp 403-410 Introduction Marine projects are one of major work in the Hong Kong construction industry. More than forty marine projects are in progress by the Hong Kong government (see Table 1) (Hong Kong Government, 2007), which include bulkheads, seawalls, foundation piles, docks, inspections, piers dredging an...

متن کامل

Lightweight Risk Management in Agile Projects

Risk management in software engineering has become a recognized project management practice but it seems that not all companies are systematically applying it. At the same time, agile methods have become popular, partly because proponents claim that agile methods implicitly reduce risks due to for example, more frequent and earlier feedback, shorter periods of development time and easier predic...

متن کامل

Risk management in small construction projects

Risks and other uncertainties can cause losses, which lead to increasing costs and time delays,both during the project and at the end. The need to prevent failures during the constructionprocess and other losses related to construction has been emphasised in various reports.Example consequences are failure costs in civil works which can be close to 8% of the totalbudget for proj...

متن کامل

Risk and risk management in software projects: A reassessment

0164-1212/$ see front matter 2008 Elsevier Inc. A doi:10.1016/j.jss.2008.03.059 E-mail address: [email protected] Controlling risk in software projects is considered to be a major contributor to project success. This paper reconsiders the status of risk and risk management in the literature and practice. The analysis is supported by a study of risk practices in government agencies in ...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 13  شماره 37

صفحات  103- 114

تاریخ انتشار 2015-03

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023