Amir Ebrahimzadeh Pilerood

Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran.

[ 1 ] - Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...

نویسندگان همکار