نتایج جستجو برای: non fixed time interval

تعداد نتایج: 3239871  

Journal: :Computers & Industrial Engineering 2008
Imed Kacem

In this article, we consider the non-resumable case of the single machine scheduling problem with a fixed non-availability interval. We aim to minimize the weighted sum of completion times. No polynomial 2-approximation algorithm for this problem has been previously known. We propose a 2-approximation algorithm with O(n) time complexity where n is the number of jobs. We show that this bound is ...

Journal: :Transactions of the Society of Instrument and Control Engineers 1984

Hessameddin Zegordi, Mostafa Khatami

This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید