2014
Alan J. Soper Vitaly A. Strusevich

For a scheduling problem on parallel machines, the power of preemption is defined as the ratio of the makespan of an optimal non-preemptive schedule over the makespan of an optimal preemptive schedule. For m uniform parallel machines, we give the necessary and sufficient conditions under which the global bound of 2 − 1/m is tight. If the makespan of the optimal preemptive schedule is defined by...

2018
Mitra Nasri Geoffrey Nelissen Björn B. Brandenburg

An effective way to increase the timing predictability of multicore platforms is to use non-preemptive scheduling. It reduces preemption and job migration overheads, avoids intra-core cache interference, and improves the accuracy of the worst-case execution time (WCET) estimation. However, existing schedulability tests for global non-preemptive multiprocessor scheduling are often too pessimisti...

Journal: :Discrete Applied Mathematics 1995
Zhen Liu Eric Sanlaville

This paper is concerned with the problem of scheduling preemptive tasks subject to precedence constraints in order to minimize the maximum lateness and the makespan. The number of available parallel processors is allowed to vary in time. It is shown that when an Earliest Due Date rst algorithm provides an optimal nonpreemptive schedule for unit-execution-time (UET) tasks, then the preemptive pr...

Journal: :Journal of Computer and System Sciences 2003

2009
Florian Diedrich Klaus Jansen Ulrich M. Schwarz Denis Trystram

In this chapter we present recent contributions in the field of sequential job scheduling on network machines which work in parallel; these are subject to temporary unavailability. This unavailability can be either unforeseeable (online models) or known a priori (offline models). For the online models we are mainly interested in preemptive schedules for problem formulations where the machine un...

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

2017
Mitra Nasri Robert I. Davis Björn B. Brandenburg

The OS scheduler’s memory and runtime overheads form crucial design constraints for embedded systems implemented on low-cost hardware platforms. Table-driven scheduling can provide a high level of schedulability; however, it also consumes significant amounts of memory. By contrast, effective non-preemptive scheduling policies, such as the non-workconserving Critical-Window EDF (CW-EDF), have lo...

2009
Philippe Baptiste Jacques Carlier Alexander V. Kononov Maurice Queyranne Sergey Sevastyanov Maxim Sviridenko

We consider parallel machine scheduling problems with identical machines and preemption allowed. It is shown that every such problem with chain precedence constraints and release dates and an integer-concave objective function satisfies the following integrality property : for any problem instance with integral data there exists an optimal schedule where all interruptions occur at integral date...

2007
Nicole Megow Tjark Vredeveld

We consider the preemptive and non-preemptive problems of scheduling jobs with precedence constraints on parallel machines with the objective to minimize the sum of (weighted) completion times. We investigate an online model in which the scheduler learns about a job when all its predecessors have completed. For scheduling on a single machine, we show matching lower and upper bounds of Θ(n) and ...