نتایج جستجو برای: two stage assembly flow shop problem

تعداد نتایج: 3779582  

2016
Nacira Chikhi Moncef Abbas Nacira CHIKHI

This paper considers a two-stage hybrid flow shop scheduling problem. The objective is the minimizing of maximum completion time of all the jobs. There exist two dedicated machines at stage 1 and one machine at stage 2. Each job is defined by two operations processed on the two-stages in series. Depending on the job type, the job is processed on either of the two machines at stage1 and must be ...

Journal: :JAMDS 2007
Esra Ekinci Arslan M. Örnek

We consider the problem of determining realistic and easy-to-schedule lot sizes in a multiproduct, multistage manufacturing environment. We concentrate on a specific type of production, namely, flow shop type production. The model developed consists of two parts, lot sizing problem and scheduling problem. In lot sizing problem, we employ binary integer programming and determine reorder interval...

D. Rahmani, , M. Saidi-Mehrabad, , R. Ramezanian, ,

Flow shop scheduling problem with missing operations is studied in this paper. Missing operations assumption refers to the fact that at least one job does not visit one machine in the production process. A mixed-binary integer programming model has been presented for this problem to minimize the makespan. The genetic algorithm (GA) and tabu search (TS) are used to deal with the optimization...

Journal: :Computers & Industrial Engineering 2011
Abir Ben Hmida Mohamed Haouari Marie-José Huguet Pierre Lopez

This paper investigates how to adapt a discrepancy-based search method to solve two-stage hybrid flowshop scheduling problems in which each stage consists of several identical machines operating in parallel. The objective is to determine a schedule that minimizes the makespan. We present an adaptation of the Climbing Depth-bounded Discrepancy Search (CDDS) method based on Johnson’s rule and on ...

Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...

Journal: :Computers & OR 1996
John K. Karlof Wei Wang

A two level branch and bound algorithm is developed to solve an altered form of the standard flow-shop scheduling problem modeled as a bilevel programming problem. The flow-shop scheduling problem considered here differs from the standard problem in that operators are assigned to the machines and each operator has a different time table for the jobs on each machine. The shop owner is considered...

1992
Riccardo Bettati Jane W.-S. Liu

In a distributed system or communication network tasks may need to be executed on more than one processor. For time-critical tasks, the timing constraints are typically given as end-to-end release-times and deadlines. This paper describes algorithms to schedule a class of systems where all the tasks execute on different processors in turn in the same order. This end-to-end scheduling problem is...

Journal: :journal of optimization in industrial engineering 2012
esmaeil najafi bahman naderi hassan sadeghi mehdi yazdani

this paper studies the hybrid flow shop scheduling where the optimization criterion is the minimization of total tardiness. first, the problem is formulated as a mixed integer linear programming model. then, to solve large problem sizes, an artificial immune algorithm hybridized with a simple local search in form of simulated annealing is proposed. two experiments are carried out to evaluate th...

Journal: :Int. J. Computer Integrated Manufacturing 2011
Rasoul Shafaei Meysam Rabiee M. Mirzaeyan

This article may be used for research, teaching and private study purposes. Any substantial or systematic reproduction, redistribution , reselling , loan, sub-licensing, systematic supply or distribution in any form to anyone is expressly forbidden. The publisher does not give any warranty express or implied or make any representation that the contents will be complete or accurate or up to date...

Journal: :Discrete Applied Mathematics 2013
Damien Prot Christophe Rapine

We consider in this article the Two-Machine Cross-Docking Flow Shop problem, which is a special case of scheduling with typed tasks, where we have two types of tasks and one machine per type. Precedence constraints exist between tasks, but only from a task of the first type to a task of the second type. The precedence relation is thus a directed bipartite graph. Minimizing the makespan is stron...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید