Abstract This article presents the performance of cable-stayed bridge by representing a model using ANSYS program under influence concentrated load and then comparing them with experimental results. One was used in analytical, one (harp type 1) length girder (4,500 mm), height pylon (1,480 depth flange for (40 mm). If bridges are constructed balanced cantilever method, stability problem is more...