نتایج جستجو برای: cable stayed bridge

تعداد نتایج: 68438  

2014
Xu Xie Xiaozhang Li Yonggang Shen

In this study, the scope of CFRP cables in cable-stayed bridges is studied by establishing a numerical model of a 1400-m span of the same. The mechanical properties and characteristics of CFRP stay cables and of a cable-stayed bridge with CFRP cables are here subjected to comprehensive analysis. The anomalies in the damping properties of free vibration, nonlinear parametric vibration and wind f...

Journal: :IJDSN 2013
Dan-Hui Dan Yiming Zhao Tong Yang Xing-Fei Yan

An index system for the health-status evaluation of cable-stayed bridges is presented based on a set of dissimilarity measures (abbr. DM) of the cable force of grouped cables. The DMs and its corresponding health status labels derived by the serviceability limit states of a bridge are determined by the combination of the finite element method and the influence matrix method. The Monte-Carlo met...

2013
Atul K. Desai

To increase the maximum span of cable-stayed bridges, Uwe Starossek has developed a modified statical system. The basic idea of this new concept is the use of pairs of inclined pylon legs that spread out longitudinally from the foundation base or from the girder level. Spread-pylon cable-stayed bridge has distinct advantage like reduction of sag of cables and oscillation of cable during earthqu...

2012
Weifeng Wang Guoqing Huang Xianwei Zeng

The nearly 21-year-old Jiujiang Bridge, which is suffering from uneven line shape, constant great downwarping of the main beam and cracking of the box girder, needs reinforcement and cable adjustment. It has undergone cable adjustment for twice with incomplete data. Therefore, the initial internal force state of the Jiujiang Bridge is identified as the key for the cable adjustment project. Base...

2014
B. Asgari S. A. Osman A. Adnan

Cable-stayed bridges are one of the most popular types of long-span bridges. The structural behaviour of cable-stayed bridges is sensitive to the load distribution between the girder, pylons, and cables. The determination of pretensioning cable stresses is critical in the cable-stayed bridge design procedure. By finding the optimum stresses in cables, the load and moment distribution of the bri...

2017
Xijun Ye Zhuo Sun Guoqing Huang

Due to the influence of load, fatigue, corrosion, natural material aging and other long-term adverse factors, the state of the internal force of a cable-stayed bridge will be changed. These long-term effects can result in the bridge not meeting specified functional requirements, and potentially resulting in structural failure. This investigation focuses on the parameter identification of a gird...

2013
Hae-Bum Yun Se-Hoon Kim Liuliu Wu Jong-Jae Lee

This paper presents the bridge cable inspection robot developed in Korea. Two types of the cable inspection robots were developed for cable-suspension bridges and cable-stayed bridge. The design of the robot system and performance of the NDT techniques associated with the cable inspection robot are discussed. A review on recent advances in emerging robot-based inspection technologies for bridge...

2013
Elizabeth Davalos Daniele Veneziano

Cable-stayed bridges have emerged as the dominant structural system for long span bridge crossings during the past thirty years. That success is due to a combination of technical advancements and pleasing aesthetics attributes. The interaction of the various structural components results in an efficient structure which is continuously evolving and providing new methods to increase span lengths....

2002
Shuqing Wang

The analysis based on an ideal state as well as the simulation and control to reach it are common issues in the design and construction of a cable-stayed bridge. For a long-span cable-stayed bridge, the huge initial stress accumulated in the pylon and the girder will reduce the overall structure stiffness. Thus, the live load evaluation employing influence lines, which is based on the Muller-Br...

2003
Yuzuru Sato Shinichi Sasaki Katsutoshi Morohashi Nobumasa Suzuki

Nagisa Bridge, a single span footbridge, was recently completed in Aomori prefecture, Japan. The structure of this bridge is a hybrid structure of cable-stayed prestressed concrete bridge and steel suspension bridge. It is the first application as this structure type of bridge in the world. Concrete girders near pylons are supported by stay cables. Steel girders are supported by suspension cabl...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید