نتایج جستجو برای: assembly flowshop

تعداد نتایج: 127701  

Journal: :Computers & OR 2007
Xiuli Wang T. C. Edwin Cheng

This paper studies the two-machine permutation flowshop scheduling problem with anticipatory setup times and an availability constraint imposed only on the first machine. The objective is to minimize the makespan. Under the assumption that interrupted jobs can resume their operations, we present a polynomial-time approximation scheme (PTAS) for this problem.

Journal: :Journal of the Operations Research Society of China 2014

Journal: :International Journal of u- and e- Service, Science and Technology 2016

Journal: :Computers & Industrial Engineering 1999

This paper proposed a parallel automated assembly line system to produce multiple products having multiple autonomous guided vehicles (AGVs). Several assembly lines are configured to produce multiple products in which the technologies of machines are shared among the assembly lines when required. The transportation between the stations in an assembly line (intra assembly line) and among station...

Journal: :Indian Journal of Science and Technology 2016

Journal: :INTERNATIONAL JOURNAL OF PRODUCTION TECHNOLOGY AND MANAGEMENT 2019

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید