Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
A detailed investigation of the mineralogy of As in the tailings of the Rabbit Lake uranium ore processing facility was conducted. The milling/ ore extraction process was sampled at three different locations to obtain information about when, where and under what condition secondary As phases form. These samples were compared with four samples of varying As content from the Rabbit Lake in-pit ta...
To achieve a successful and effective operation, the transition from open pit to underground mining requires accurate planning analysis. Numerical modeling utilizing programs like FLAC3D has been an important tool for simulating analyzing complicated geomechanical behavior connected with this shift in recent years. The use of develop model switch coal soft rocks using room pillar method is expl...
Dynamic slope stability in open-pit mines still remains a challenging task in the computational mining design. Earthquake and blasting are two significant sources of dynamic loads that can cause many damages to open-pit mines in active seismic areas and during exploitation cycles. In this work, the effects of earthquake and blasting on the stability of the NW slope of Chadormalu mine are compar...
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
Similar to the mixed-integer programming library (MIPLIB), we present a library of publicly available test problem instances for three classical types of open pit mining problems: the ultimate pit limit problem and two variants of open pit production scheduling problems. The ultimate pit limit problem determines a set of notional three-dimensional blocks containing ore and/or waste material to ...
The Certej basin is situated in the North of Deva town, in Apuseni Mountains and was an important nonferrous mining region. In present the mining activities were stopped, but the acid mine drainage is still affecting the underground water quality. Acid Mine Drainage takes place where sulphide-bearing material is exposed to oxygen and water. This drainage water is characterized by low pH, high s...