نتایج جستجو برای: sequence dependent setup times

تعداد نتایج: 1400139  

2005
Zrinka Lukač Kristina Šorić

The wellknown CLSP problem is generalized including sequence dependent setup times and overtimes and modeling it as a quadratic mixed 0-1 integer programming problem called Capacitated Lot Sizing Problem with Sequence Dependent Setups and Overtimes. We develop a heuristics based on Lagrangean relaxation and tabu search for solving the problem. At the end, some computational results are presented.

The aim of this paper is to propose a new particle swarm optimization algorithm to solve a hybrid flowshop scheduling with sequence-dependent setup times problem, which is of great importance in the industrial context. This algorithm is called diversified particle swarm optimization algorithm which is a generalization of particle swarm optimization algorithm and inspired by an anarchic society ...

2006
Yuri N. Sotskov Natalja G. Egorova Tsung-Chyan Lai Frank Werner

This article addresses the job-shop problem of minimizing the schedule length (makespan) for processing n jobs on two machines with sequence-dependent setup times and removal times. The processing of each job includes at most two operations that have to be non-preemptive. Machine routes may differ from job to job. If all setup and removal times are equal to zero, this problem is polynomially s...

2014
Aymen Sioud Caroline Gagné Marc Gravel

In this paper, we propose three new metaheuristic implementations to address the problem of minimizing the makespan in a hybrid flexible flowshop with sequence-dependent setup times. The first metaheuristic is a genetic algorithm (GA) embedding two new crossover operators, and the second is an ant colony optimization (ACO) algorithm which incorporates a transition rule featuring lookahead infor...

2011
Matheus N. Haddad Marcone J. F. Souza Maria Cláudia F. M. C. Souza Vitor N. Coelho

This work addresses the unrelated parallel machine scheduling problem where setup times are sequence-dependent and machine-dependent. The maximum completion time of the schedule, known as makespan, is considered as an objective to minimize. Few studies has been done about this problem, which is a motivation to the development of this work. Other motivations are the fact that it is NP-Hard and i...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید