We consider the distributed optimization problem where $n$ agents, each possessing a local cost function, collaboratively minimize average of functions over connected network. Assuming stochastic gradient information is available, we study algorithm, called exact diffusion with adaptive stepsizes (EDAS) adapted from Exact Di...
We present a method for setting release times for jobs with due dates in a stochastic production flow line for which the sequence of jobs has been determined. Unlike other approaches to this problem, ours considers a transient situation. Thus, the flow line will typically contain work in process (WIP), that is, jobs that have been previously released to the system. Our goal is to develop a job ...
This paper proposes tools which will be used to optimize multi-level assembly under lead time uncertainty. One type of finished products and several types of components are considered. We suppose that each component has a fixed unit inventory cost and the finished product has backlogging and inventory holding costs per unit of time. The lead times of components are discrete random variables, an...
Abstract: This paper examines a supply planning problem for multilevel serial production systems under lead time uncertainties. The techniques used in industry are often based on the assumption that the lead times are known. However, in a supply chain the lead times are often random variables. Therefore, it is necessary to evaluate the influence of the planned lead times on the total cost. An e...
this paper presents an overview of new approaches in rapid product development in production networks from design points of view. the manufacturing industries are changing their focus to global sourcing as a means to improve performance and enhance competitiveness. some partnerships created with this strategy improve product development through collaborative design. with the advent of e-commerc...
Problem statement: Identifying critical tasks in a project network is easily done when task times are deterministic, but doing so under stochastic task times is problematic. The few methods that have been proposed contain serious drawbacks which lead to identifying critical tasks incorrectly, leaving project managers without the means to (1) identify and rank the most probable sources of projec...
This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable m...
A major assumption in the analysis of (s, S) inventory systems with stochastic lead times is that orders are received in the same sequence as they are placed. Even under this assumption, much of the work to date has focused on the unconstrained optimization of the system, in which a penalty cost for unsatisfied demand is assigned. The literature on constrained optimization, wherein a service le...