نتایج جستجو برای: sequence dependent setup time

تعداد نتایج: 2781686  

2006
Yuri N. Sotskov Natalja G. Egorova Tsung-Chyan Lai Frank Werner

This article addresses the job-shop problem of minimizing the schedule length (makespan) for processing n jobs on two machines with sequence-dependent setup and removal times. The processing of each job includes at most two operations that have to be non-preemptive. Machine routes may differ from job to job. If all setup and removal times are equal to zero, this problem is polynomially solvable...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه یزد 1389

در این پایان نامه در آغاز با بیان اهمیت مطالعه پلاسما با توجه به کاربردهای متعدد آن به معرفی ویژگی ها و روش های ایجاد اشعه ایکس از برهم کنش لیزر با پلاسما پرداخته ایم. سپس مدل های مختلف پلاسما و مدل های تعادلی آن معرفی شده است. از میان این مدل ها مدل تعادل ترمودینامیکی غیر موضعی nlte)) جهت بررسی انتخاب شده است. در این مدل با حل معادله آهنگ، جمعیت فازهای یونی مختلف را با تشکیل ماتریس آهنگ محاسبه...

2016
M. K. Marichelvam K. Manivannan M. Geetha

In this paper, single machine scheduling problems with sequence dependent setup times are considered. The objective is to minimize the total weighted tardiness. The single machine total weighted tardiness (SMTWT) scheduling problems with sequence dependent setup times were proved to be strongly NP-hard. A recently developed meta-heuristic algorithm called as crow search algorithm is proposed to...

This paper presents a new mathematical programming model for an integrated production and air transportation in supply chain management with sequence-dependent setup times in order to design an applied procedure for the production and distribution schedule. The aim of this model is to minimize the total supply chain cost consisting of the costs of distribution, production earliness and tardines...

This paper presents a new mathematical programming model for an integrated production and air transportation in supply chain management with sequence-dependent setup times in order to design an applied procedure for the production and distribution schedule. The aim of this model is to minimize the total supply chain cost consisting of the costs of distribution, production earliness and tardines...

This paper presents a new mathematical model for a production system through a scheduling problem considering a material handling system as an intelligent transportation system by automated guided vehicles (AGVs). The traditional systems cannot respond to the changes and customer’s demands and for this reason, a flexible production system is used. Therefore, for this purpose, automated transpor...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید