نتایج جستجو برای: flexible flow line scheduling

تعداد نتایج: 1036547  

Journal: :CoRR 2016
Daniral Roudi Ali Vatankhah Barenji Reza Vatankhah Barenji Majid Hashemipour

Dynamic rescheduling decision-making problem is an important issue in modern manufacturing system with the feature of combinational computation complexity. This paper introduces a multi-agent based approach using the detailed process, provided by Prometheus methodology, which used for the design of a simultaneous dynamic rescheduling decision making for flexible flow line manufacturing system t...

Journal: :journal of industrial engineering, international 2009
m.t taghavi-fard h.r dehnar saidy

in this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. this study seems utterly new and it is applicable to any performance measure based on the completion time. the in...

2009
Xiaofeng Li Hai Zhao

Flexible flow shop scheduling problem (also called blended flow shop scheduling problem) is a sort of complex Job Shop Scheduling problem. For the Flexible Flow Shop scheduling problem, only in very special cases, there are polynomial optimal algorithms. In most of the other cases, the problems are NP-Hard. It is a simplification of the original problem to solve Flexible flow shop scheduling wi...

Journal: :journal of optimization in industrial engineering 2013
davod abachi fariborz jolai hasan haleh

tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. hence, integration has been proposed to decide about these problems concurrently. main problem in integration is how we can relate pro...

Journal: :مدیریت صنعتی 0
بابک اسلانی کارشناس ارشد مدیریت صنعتی، دانشکده مدیریت و حسابداری، دانشگاه شهید بهشتی، تهران، ایران مصطفی زندیه دانشیار گروه مدیریت دانشکده مدیریت و حسابداری، دانشگاه شهید بهشتی، تهران، ایران مجید عادلی دانشجوی دکتری مدیریت تولید و عملیات، دانشکده مدیریت و حسابداری، دانشگاه شهید بهشتی، تهران، ایران

one of the main challenges for manufacturers in production systems on order is balancing between orders, inputs and limited resources. hence, they have to choose some orders and reject the others. in addition, work schedule must be considered in order acceptance. in this research the integrated problem of scheduling and order acceptance in a no wait flexible flow line production system is discu...

Flexible flow shop scheduling problem (FFS) with unrelated parallel machines contains sequencing in flow shop where, at any stage, there exists one or more processors. The objective consists of minimizing the maximum completion time. Because of NP-completeness of FFS problem, it is necessary to use heuristics method to address problems of moderate to large scale problem. Therefore, for assessme...

Raviteja Buddala Siba Sankar Mahapatra

Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...

In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

H.R Dehnar Saidy M.T Taghavi-Fard

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید