نتایج جستجو برای: graph based scheduling

تعداد نتایج: 3109640  

This paper considers a different version of the parallel machines scheduling problem in which the parallel jobs simultaneously requirea pre-specifiedjob-dependent number of machines when being processed.This relaxation departs from one of the classic scheduling assumptions. While the analytical conditions can be easily statedfor some simple models, a graph model approach is required when confli...

Journal: :journal of optimization in industrial engineering 2010
hassan rashidi edward p.k tsang

in this paper, an efficient extension of network simplex algorithm is presented. in static scheduling problem, where there is no change in situation, the challenge is that the large problems can be solved in a short time. in this paper, the static scheduling problem of automated guided vehicles in container terminal is solved by network simplex algorithm (nsa) and nsa+, which extended the stand...

In this paper, an efficient extension of network simplex algorithm is presented. In static scheduling problem, where there is no change in situation, the challenge is that the large problems can be solved in a short time. In this paper, the Static Scheduling problem of Automated Guided Vehicles in container terminal is solved by Network Simplex Algorithm (NSA) and NSA+, which extended the stand...

Journal: :IEEE Transactions on Parallel and Distributed Systems 2016

Journal: :IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems 2013

Journal: :IEEE Transactions on Wireless Communications 2021

Link scheduling in device-to-device (D2D) networks is usually formulated as a non-convex combinatorial problem, which generally NP-hard and difficult to get the optimal solution. Traditional methods solve this problem are mainly based on mathematical optimization techniques, where accurate channel state information (CSI), obtained through estimation feedback, needed. To overcome high computatio...

Journal: :Journal of the Construction Division and Management 2023

The construction industry has been suffering from delays and cost overruns for decades. Experienced schedulers programs allocate contingencies (both time) based on professional experiences gained knowledge. Such tacit knowledge not captured, stored, shared with inexperienced schedulers. This paper proposes a graph-based automated scheduling (GAS) method to capture, store, reuse the in schedules...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید