Journal: :journal of optimization in industrial engineering 2014
mohammad asghari samaneh nezhadali

appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. one type of scheduling problems is just-in-time (jit) scheduling and in this area, motivated by jit manufacturing, this study investigates a mathematical model for...

Journal: :journal of quality engineering and production optimization 2015
sahar tadayoni rad saiedeh gholami rasoul shafaei hany seidgar

this paper considers a two-stage assembly flow shop problem (tafsp) where m machines are in the first stage and an assembly machine is in the second stage. the objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. jit seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه فردوسی مشهد - دانشکده علوم 1377

chapter one is devoted to a moderate discussion on preliminaries, according to our requirements. chapter two which is based on our work in (24) is devoted introducting weighted semigroups (s, w), and studying some famous function spaces on them, especially the relations between go (s, w) and other function speces are invesigated. in fact this chapter is a complement to (32). one of the main fea...

Journal: :journal of optimization in industrial engineering 2010
bahman naderi mostafa zandieh seyed mohammad taghi fatemi ghomi

this paper explores the flexile flow lines where setup times are sequence- dependent. the optimization criterion is the minimization of total weighted completion time. we propose an iterated greedy algorithm (iga) to tackle the problem. an experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of iga are compared against those of some other exist...

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه سیستان و بلوچستان - دانشکده مهندسی 1392

flow in natural river bends is a complex and turbulent phenomenon which affects the scour and sedimentations and causes an irregular bed topography on the bed. for the reason, the flow hydralics and the parameters which affect the flow to be studied and understand. in this study the effect of bed and wall roughness using the software fluent discussed in a sharp 90-degree flume bend with 40.3cm ...

Bahman Naderi mostafa Zandieh Seyed Mohammad Taghi Fatemi Ghomi

This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...

A.H Gharehgozli

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

Hany Seidgar Rasoul Shafaei Sahar Tadayoni Rad, Saiedeh Gholami

This paper considers a two-stage assembly flow shop problem (TAFSP) where m machines are in the first stage and an assembly machine is in the second stage. The objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. JIT seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...