نتایج جستجو برای: bi objective warehouse problem
تعداد نتایج: 1425513 فیلتر نتایج به سال:
In this paper, we investigate the bi-objective multiperiod one-dimensional cutting stock problem that seeks to minimize cost of production associated with total length cut objects (waste) and inventory costs related items. A mathematical model is presented heuristically solved by a column generation method. Computational tests were performed using Weighted Sum method, ε-Constraint method variat...
nowadays, the environmental impact of transportation project and, especially air pollution impacts, are major concerns in evaluating transportation projects. based on this concern, beside definition of traditional objective functions like total travel time and total investment cost, different type of environmental related function is considered as objective function in urban network design. in ...
Many studies focus on inventory systems to analyze different real-world situations. This paper considers a two-echelon supply chain that includes one warehouse and one retailer with stochastic demand and an up-to-level policy. The retailer’s lead time includes the transportation time from the warehouse to the retailer that is unknown to the retailer. On the other hand, the warehouse is unaware ...
The corporate data warehouse integrates data from various operational data stores of a company. These operational data stores may be heterogeneous with respect to the represented information. The hetero-homogeneous data warehouse modeling approach overcomes issues associated with the integration of heterogeneous information from the operational data stores by featuring a generally homogeneous s...
in this paper, a facility location problem of distribution systems, as one of the important and strategic issues in supply chain management, has been studied in a three-level supply chain under a stochastic condition. for this purpose, a two-stage mathematic model has been proposed for the location-allocation problem of distribution systems with regard to backup facilities for disrupting wareho...
This paper proposes Enterprise Business Intelligence Maturity Model that involves thirteen capacity factors, which are (Strategic Management, Performance Measurement, Balanced Scorecard, Information Quality, Data Warehouse, Master Data Management, Metadata Management, Analytical, Infrastructure, Knowledge Management, People, Organization Culture and Change Management). This key objective of thi...
In this paper, a bi-objective multi-product single-vendor single-buyer supply chain problem is studied under green vendor-managed inventory (VMI) policy based on the economic production quantity (EPQ) model. To bring the model closer to real-world supply chain, four constraints of model including backordering cost, number of orders, production budget and warehouse space are considered stochasti...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید