This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...

Journal: :journal of optimization in industrial engineering 2012
behrouz afshar nadjafi amir rahimi hamid karimi

in this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (mrcpsp) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. we present a depth-first branch and bound algorithm for the resource constrained project schedulin...

Journal: :international journal of industrial engineering and productional research- 0
m. ranjbar no.516, department of industrial engineering, faculty of engineering, ferdowsi university of mashhad

in this paper, we consider scheduling of project networks under minimization of total weighted resource tardiness penalty costs. in this problem, we assume constrained resources are renewable and limited to very costly machines and tools which are also used in other projects and are not accessible in all periods of time of a project. in other words, there is a dictated ready date as well as a d...

Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...

Journal: :XIKUA Boletín Científico de la Escuela Superior de Tlahuelilpan 2013

K. Zia Dabirian, K. Zia Ghazvini, M. Khanzadi,

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

Journal: :Foundations and Trends® in Technology, Information and Operations Management 2009

M. Fallah

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

Journal: :Emperor Journal of Applied Scientific Research 2020

In the last decade, theory of constraint application in project management lead to make a new approach for project scheduling and control as a critical chain. In this paper, a multi-objective optimization model for multi-project scheduling on critical chain is investigated. The objectives include time, cost and quality. In order to solve the problem, a Simulated Annealing algorithm is developed...