This paper deals with a multi-agent-based interval type-2 fuzzy (IT2F) expert systemfor scheduling steel continuous casting. Continuous caster scheduling is a complex and extensiveprocess that needs expert staff. In this study, a distributed multi-agent-based structure is proposed as asolution. The agents used herein can cooperate with each other via various communication protocols.To facilitat...

Emad Roghanian Javad Hassan pour zahra Sadat Hosseini,

In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...

Journal: :Sustainability 2023

In a production environment, scheduling decides job and machine allocations the operation sequence. shop system, wide variety of jobs, complex routes, real-life events becomes challenging for activities. New, unexpected disrupt schedule require dynamic updates to on an event-based basis. To solve problem, we propose multi-agent system with reinforcement learning aimed at minimization tardiness ...

Journal: :CoRR 2011
Imen Harbaoui Dridi Ryan Kammarti Pierre Borne Mekki Ksouri

The PDPTW is an optimization vehicles routing problem which must meet requests for transport between suppliers and customers satisfying precedence, capacity and time constraints. We present, in this paper, a genetic algorithm for multi-objective optimization of a dynamic multi pickup and delivery problem with time windows (Dynamic m-PDPTW). We propose a brief literature review of the PDPTW, pre...

Journal: :Intelligenza Artificiale 2015
Marco Baioletti Alfredo Milani Valentino Santucci

Real-world versions of the permutation flowshop scheduling problem (PFSP) have a variety of objective criteria to be optimized simultaneously. Multi-objective PFSP is also a relevant combinatorial multi-objective optimization problem. In this paper we propose a multiobjective evolutionary algorithm for PFSPs by extending the previously proposed discrete differential evolution scheme for single-...

2012
Sergey Polyakovskiy Rym M'Hallah

The weighted earliness tardiness parallel machine scheduling problem is NP hard. It is herein approximately solved using a decentralized multi-agent system (MAS). MAS acts as a moderator of two types of agents: free jobs, and groups of jobs assigned to machines. MAS yields good solutions’ quality in reduced run times as evidenced by the computational results. Most importantly, it can be easily ...

2012
Leila Emami

This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequencedependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the ov...

2015
Ashwani Kumar Dhingra

In the present work, an industrial case study has been considered for multi-objective flow shop scheduling problem including the sequence dependent set up time. The multi-objectives include the minimization of sum of total weighted squared tardiness, total weighted squared earliness, makespan and number of tardy jobs. Industries can select the optimal sequence with respect to required objective...

2014
Dominik ŻELAZNY

In this paper the flow shop scheduling problem with minimizing two criteria simultaneously is consider. Selected criteria are: makespan and the sum of tardiness of jobs. For each separate criteria the problem is strongly NP-hard, which makes it NP-hard as well. There is a number of heuristic algorithms to solve the flow shop problem with various single objectives, but heuristics for multi-crite...

Journal: :Appl. Soft Comput. 2001
Mikkel T. Jensen

The traditional focus of scheduling research is on finding schedules with a low implementation cost. However, in many real world scheduling applications finding a robust or flexible schedule is just as important. A robust schedule is a quality schedule expected to still be acceptable if something unforeseen happens, while a flexible schedule is a quality schedule expected to be easy to change. ...