نتایج جستجو برای: term time horizon

تعداد نتایج: 2372078  

Journal: :مهندسی برق و الکترونیک ایران 0
m. mollahassani-pour m. rashidinejad a. abdollahi s. nikbakhsh

preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. it consists of knowing which generating units should be shut down for regular safety inspection. in this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (cri) is pr...

2017
C. Kenneth Jones

The paper compares three portfolio optimization models. Modern portfolio theory (MPT) is a short-horizon volatility model. The relevant time horizon is the sampling interval. MPT is myopic and implies that investors are not concerned with long-term variance or mean-reversion. Intertemporal portfolio choice is a multiple period model that revises portfolios continuously in response to relevant s...

2003
Gabriele Pannocchia Eric C. Kerrigan

This paper addresses the design of a dynamic, nonlinear, time-invariant, state feedback controller that guarantees constraint satisfaction and offset-free control in the presence of unmeasured, persistent, non-stationary, additive disturbances. First, this objective is obtained by designing a dynamic, linear, time-invariant, offset-free controller, and an appropriate domain of attraction for th...

A. Younesi, M.R. Feyzi, S. Tohidi

Model predictive control (MPC) based methods are gaining more and more attention in power converters and electrical drives. Nevertheless, high computational burden of MPC is an obstacle for its application, especially when the prediction horizon increases extends. At the same time, increasing the prediction horizon leads to a superior response. In this paper, a long horizon MPC is proposed to c...

2010
Uğur Yüzgeç Jose A. Romagnoli

A model predictive control (MPC) strategy is developed to determine the optimal solution of the short-term refinery production planning problem. The main objective of the proposed algorithm is to maximize the total profit and to minimize the costs regarding the refinery process over a planning horizon. The refinery planning problem is solved in discrete time over a pre-determined prediction hor...

Article history: Received date: 28 July, 2016 Review date: 7 August, 2016 Accepted date:25 August 2016 Printed online: 1 September Purpose: The aim of the present study was to determine the effectiveness of group hope therapy on the time horizon and Optimism of divorced women aged between 25 to 40 years old in Tehran who referred to counseling centers. Materials and method: 30 ...

2008
Stephen Few

Page 1 of 7 To say that information visualization is still a young and evolving fi eld is a considerable understatement. We are still only scratching the surface of its potential. As the science on which it is built continues to yield new insights and an increasing number of talented and innovative people apply these insights in search of new solutions, we can expect eye-opening progress in the...

2008
Tatiana Ermolieva

The goal of this paper is to specify and summarize assumptions and proofs for new approaches to discounting proposed in our catastrophic risk management studies. The main issue is concerned with justification of investments, which may turn into benefits over long and uncertain time horizon. For example, how can we justify mitigation efforts for expected 300-year flood that can occur also next y...

A. Miranbeigi , A.A. Jalali, M. Miranbeigi,

    supply chain network   receding horizon control demand move suppression term   Supply chain networks are interconnection and dynamics of a demand network. Example subsystems, referred to as stages, include raw materials, distributors of the raw materials, manufacturers, distributors of the manufactured products, retailers, and customers. The main objectives of the control strategy for the s...

Abdollahi, A. , Mollahassani-pour, M. , Nikbakhsh, S. , Rashidinejad, M. ,

Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید