نتایج جستجو برای: scheduling single machine periodic maintenance total earliness

تعداد نتایج: 2076130  

Journal: :Computers & Industrial Engineering 2006
Jorge M. S. Valente

In this paper, we present dominance conditions for the single machine weighted earliness scheduling problem with no idle time. We also propose an algorithm that can be used to improve upper bounds for the weighted earliness criterion and lower bounds for an earliness/tardiness problem. The computational tests show that the algorithm is superior to an initial heuristic schedule and an existing a...

Journal: :journal of optimization in industrial engineering 2014
mohammad asghari samaneh nezhadali

appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. one type of scheduling problems is just-in-time (jit) scheduling and in this area, motivated by jit manufacturing, this study investigates a mathematical model for...

Journal: :مهندسی صنایع 0
محمّد رضائی ملک دانشجوی دکتری مهندسی صنایع پردیس دانشکده‏های فنی دانشگاه تهران رضا توکلی مقدم استاد دانشکدة مهندسی صنایع پردیس دانشکده‏های فنی دانشگاه تهران فرشید عوض آبادیان کارشناس ارشد مهندسی صنایع پردیس دانشکده‏های فنی دانشگاه تهران

this paper presents a new bi-objective mathematical model for a permutation flowshop scheduling problem with availability constraint in case of preventive maintenance operations on machines. in this paper, preventive maintenance is flexible and there is not a certain time for the maintenance operation; however, time between two consecutive maintenance operations for each machine should not be g...

Journal: :Mathematical and Computer Modelling 2004
Volker Lauff Frank Werner

The just-in-time production philosophy has led to a growing interest in scheduling problems considering both earliness and tardiness penalties. Most publications considering these so-called non-regular objective functions are devoted to single machine problems. In the case of multi-machine problems, there are some papers dealing with parallel machine problems. However, for multi-operation sched...

Journal: :Systems 2023

This paper investigates single-machine scheduling with a deteriorating maintenance activity, where the processing time of job depends on whether it is handled before or after activity. Under common and slack due date assignments, aim to find optimal schedule, position value (flow-allowance) so that linear weighted sum earliness, tardiness minimized, weights are location-dependent (position-depe...

2007
Morteza Bagherpour Kazem Noghondarian Siamak Noori

Single machine scheduling problems with earliness and tardiness penalty are well known, but in the case of sequence dependent, the problem is more difficult and there are few researches around it. In related researches, setup time matrix was defined as a deterministic matrix. In this paper sequence dependent single machine scheduling with earliness tardiness penalty considerations using fuzzy s...

2017
Kerem Bülbül Safia Kedad-Sidhoum Halil Şen

Research on non-regular performance measures is at best scarce in the deterministic machine scheduling literature with machine unavailability constraints. Moreover, almost all existing works in this area assume either that processing on jobs interrupted by an interval of machine unavailability may be resumed without any additional setup/processing or that all prior processing is lost. In this w...

Journal: :IJORIS 2012
Deniz Mungan Junfang Yu Bhaba R. Sarker Mohammad Anwar Ashek Rahman

A Pareto-optimal solution is developed in this paper for a scheduling problem on a single machine with periodic maintenance and non-preemptive jobs. Most of the scheduling problems address only one objective function, while in the real world, such problems are always associated with more than one objective. In this paper, both multi-objective functions and multi-maintenance periods are consider...

Journal: :J. Heuristics 2007
Shih-Wei Lin Shuo-Yan Chou Shih-Chieh Chen

This study addresses a class of single-machine scheduling problems involving a common due date where the objective is to minimize the total job earliness and tardiness penalties. A genetic algorithm (GA) approach and a simulated annealing (SA) approach utilizing a greedy local search and three well-known properties in the area of common due date scheduling are developed. The developed algorithm...

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید