Mohammadreza Shahriari

The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

2009
Jacob Jan Paulus

This thesis presents new and improved scheduling algorithms for a number of scheduling problems. The first part of the thesis deals with two online-list scheduling problems, both with the objective to minimize the makespan. In these problems, the jobs arrive one by one and the decision maker has to irrevocably schedule the arriving job before the next job becomes known. In the second part, a ne...

Journal: :international journal of optimaization in civil engineering 0
e. hemat m.v.n. sivakumar

critical path method (cpm) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. despite its popularity, cpm has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. the analytical competency and computing capability of cpm thus...

Journal: :journal of optimization in industrial engineering 2014
zahra sadat hosseini javad hassan pour emad roghanian

in this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the p-mmrcpsp while due dates are included i...

Journal: :journal of industrial engineering, international 2006
s.s hashemin s.m.t fatemi ghomi

this paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. if the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. it is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. the ...

    Project scheduling   Net present value   We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a t...

As a general branch of project scheduling problems, resource investment problem (RIP) considers resource availabilities as decision variables to determine a level of employed resources minimizing the costs of the project. In addition to costs (cash outflows), researchers in the later extensions of the RIP took payments (cash inflows) received from clients into account and used the net present v...