We address the single-machine stochastic scheduling problem with an objective of minimizing total expected earliness and tardiness costs, assuming that processing times follow normal distributions and due dates are decisions. We develop a branch and bound algorithm to find optimal solutions to this problem and report the results of computational experiments. We also test some heuristic procedur...
This study investigates the single-machine scheduling problem with common due-win -dow assignment, past-sequence-dependent (p-s-d) setup times and a deteriorating maintenance activity. By past-sequence-dependent setup times, we mean that the setup time of a job is proportional to the sum of the processing times of the jobs already processed. The objective is to minimize a cost function based on...
In the scheduling problem addressed in this note we have to determine: (i) the job sequence, (ii) the (common) due-date, and (iii) the location of a rate modifying (maintenance) activity. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. The processing time of a job scheduled after the maintenance activity decreases by a job-dependent facto...
This paper considers the problem of linding an optimal schedule and a common due date for a set of jobs, in a static single machine system. The scheduling criterion is the minimization of the weighted sum of earliness and tardiness values. Different weights are considered as the earliness penalty and tardiness penalty, for each job. A branching procedure is presented for finding an optimal solu...
We consider a single-machine scheduling problem with periodic maintenance activities. Although the scheduling problem with maintenance has attracted researchers’ attention, most of past studies considered only one maintenance period. In this research several maintenance periods are considered where each maintenance activity is scheduled after a periodic time interval. The objective is to find a...
The single-machine early/tardy (E/T) scheduling problem is addressed in this research. The objective of this problem is to minimize the total amount of earliness and tardiness. Earliness and tardiness are weighted equally and the due date is common and large (unrestricted) for all jobs. Machine setup time is included and is considered sequence-dependent. When sequence-dependent setup times are ...
This paper investigates the single-machine due-window assignment scheduling with truncated learning effects and past-sequence-dependent setup times simultaneously. The scheduler has option of job-rejection, i.e., some jobs are processed other rejected. Under three (i.e., common, slack different) methods, our goal is to minimize sum a general earliness-tardiness cost weighted earliness-tardiness...
Single-Machine Maintenance Activity Scheduling with Convex Resource Constraints and Learning Effects
In this paper, the single-machine scheduling problems under common and slack due date assignments are studied, where actual processing time of job needs to consider some factors, such as convex resource allocation, maintenance activity, learning effects. The goal study is find optimal sequence, activity location, allocation (flow allowance). objective function (1) minimize sum cost (including w...
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...