نتایج جستجو برای: stochastic dynamic location
تعداد نتایج: 733250 فیلتر نتایج به سال:
abstract morphological river models are designed to provide physical insight into the morphological response and to assist river engineers and managers in the design, operation and maintenance of river systems. here deterministic modeling weak for a dynamic and stochastic of nature river environment. specially, these could not predict the exact shape of the river bed, specially e.g. for braided...
This paper develops a method for solving the single product multi-period production-planning problem, in which the production and the inventory costs of each period arc concave and backlogging is not permitted. It is also assumed that the unit variable cost of the production evolves according to a continuous time Markov process. We prove that this production-planning problem can be Stated as a ...
This paper investigates the network location problem for single-server facilities that are subject to congestion. In each network edge, customers are uniformly distributed along the edge and their requests for service are assumed to be generated according to a Poisson process. A number of facilities are to be selected from a number of candidate sites and a single server is located at each facil...
The Existence of crack in a structure leads to local flexibility and changes the stiffness and dynamic behavior of the structure. The dynamic behavior of the cracked structure depends on the depth and the location of the crack. Hence, the changes in the dynamic behavior in the structure due to the crack can be used for identifying the location and depth of the crack. In this study the first th...
the control problem and dynamic programming is a powerful tool in economics and management. we review the dynamic programming problem from its beginning up to its present stages. a problem which was involved in physics and mathematics in i 7” century led to a branch of mathematics called calculus of variation which was used in economic, and management at the end of the first quarter of the 20” ...
This study aimed at presenting a method for formulating optimal production, repair and replacement policies. The system was based on the production rate of defective parts and machine repairs and then was set up to optimize maintenance activities and related costs. The machine is either repaired or replaced. The machine is changed completely in the replacement process, but the productio...
نمودار تعداد نتایج جستجو در هر سال
با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید