نتایج جستجو برای: precedence constrained sequencing problem

تعداد نتایج: 1062380  

Journal: :Int. J. Machine Learning & Cybernetics 2016
Weimin Ma Yangyang Che Hu Huang Hua Ke

Resource-constrained project scheduling problem is to make a schedule for minimization of the makespan subject to precedence and resource constraints. In this paper, we consider an uncertain resource constrained project scheduling problem (URCPSP) with renewable resource constraints, in which activity durations, with no historical data generally, are estimated by belief degrees. For purpose of ...

Journal: :Annals OR 2001
Mario Vanhoucke Erik Demeulemeester Willy Herroelen

In this paper we study the resource-constrained project scheduling problem with weighted earliness-tardiness penalty costs. Project activities are assumed to have a known deterministic due date, a unit earliness as well as a unit tardiness penalty cost and constant renewable resource requirements. The objective is to schedule the activities in order to minimize the total weighted earliness-tard...

Journal: :Artif. Intell. 2012
Michele Lombardi Michela Milano

We propose a min-flow algorithm for detecting Minimal Critical Sets (MCS) in Resource Constrained Project Scheduling Problems (RCPSP). The MCS detection is a fundamental step in the Precedence Constraint Posting method (PCP), one of the most successful approaches for the RCPSP. The proposed approach is considerably simpler compared to existing flow based MCS detection procedures and has better ...

Amin-Naseri, , Mohammad Reza , Mokhtari, Hadi , Nakhai Kamal Abadi, Isa ,

  The project scheduling problem is known as a NP-hard problem in literature. In this research, a resource constrained project scheduling problem which is known as a NP-Hard problem is considered. This problem has attracted many researchers during recent years. The aim of this problem is to determine the optimal starting times of activities considering both precedence and available resources co...

Journal: :Annals of Operations Research 2005

Journal: :iranian journal of optimization 2010
shree ram khadka tanka nath dhamala

the product rate variation problem minimizes the variation in the rate at which different models of a common base product are produced on the assembly lines with the assumption of negligible switch-over cost and unit processing time for each copy of each model. the assumption of significant setup and arbitrary processing times forces the problem to be a two phase problem. the first phase determ...

Journal: :Computers & OR 2011
Lucio Bianco Massimiliano Caramia

In this paper we propose a new lower bound for the resource constrained project scheduling problem with generalized precedence relationships. The lower bound is based on a relaxation of the resource constraints among independent activities and on a solution of the relaxed problem suitably represented by means of an AON acyclic network. Computational results are presented and confirmed a better ...

Journal: :international journal of supply and operations management 2015
mohammad hassan sebt mohammad reza afshar yagub alipouri

in this paper, a new genetic algorithm (ga) is presented for solving the multi-mode resource-constrained project scheduling problem (mrcpsp) with minimization of project makespan as the objective subject to resource and precedence constraints. a random key and the related mode list (ml) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (mssg...

Journal: :Discrete Applied Mathematics 1996
Lucian Finta Zhen Liu

A single-machine scheduling problem with precedence delays is analyzed. A set of n tasks is to be scheduled on the machine in such a way that the makespan is minimized. The executions of the tasks are constrained by precedence delays, i.e., a task can start its execution only after any of its predecessors has completed and the delay between the two tasks has elapsed. In the case of unit executi...

Journal: :journal of optimization in industrial engineering 2014
mohammad saidi mehrabad saeed zarghami

this paper presented a mixed integer programming for integrated scheduling and process planning. the presented process plan included some orders with precedence relations similar to multiple traveling salesman problem (mtsp), which was categorized as an np-hard problem. these types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید