نتایج جستجو برای: economic lot scheduling problem

تعداد نتایج: 1248253  

Journal: :Operations Research 2000
David M. Markowitz Martin I. Reiman Lawrence M. Wein

We consider two queueing control problems that are stochastic versions of the economic lot scheduling problem: A single server processes N customer classes, and completed units enter a 'nished goods inventory that services exogenous customer demand. Unsatis'ed demand is backordered, and each class has its own general service time distribution, renewal demand process, and holding and backorderin...

Journal: :journal of optimization in industrial engineering 2015
abolfazl kazemi danial esmaeili aliabadi

there are many benefits for coordination of multiple suppliers when single supplier cannot satisfy buyer demands.  in addition, buyer needs to purchase multiple items in a real supply chain. so, a model that satisfies these requests has many advantages. we extend the existing approaches in the literature that assume all suppliers need to be put on a common replenishment cycle and each supplier ...

Journal: :journal of industrial engineering, international 2006
rasoul haji alireza haji

this paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. we have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

2012
Hany Osman Kudret Demirli

The economic lot and delivery scheduling problem for a multi-stage supply chain comprising multiple items is studied in this paper. It is required to develop a synchronized replenishment strategy, and specify the sequence of production and the replenishment cycle time that achieves synchronization through the supply chain at minimum cost. The problem is presented in a novel formulation based on...

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

Journal: :European Journal of Operational Research 1991

Journal: :European Journal of Operational Research 2021

In this paper, we consider a lot-sizing problem with the remanufacturing option under parameter uncertainties imposed on demands and returns. Remanufacturing has recently been fast growing area of interest for many researchers due to increasing awareness reducing waste in production environments, particular studies involving simultaneously are very scarce literature. We first present min-max de...

2007
João Pedro Pedroso

Production planning with lot-sizing and scheduling in industries where the cleaning times depend on the sequence of the products can be modelled as a mixed integer problem. However, this problem is very hard, and even small instances cannot be solved exactly in a reasonable time. We propose a division of the whole production planning problem into its two subproblems, and to solve each them inde...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید