نتایج جستجو برای: stochastic flexible flow shop

تعداد نتایج: 718558  

2009
Wang Shilong Yao Wei

This paper studies the single hoist scheduling problem in no-wait flexible flow shop system with constant process times. The objective is to minimize the make span in the given job tasks. Different jobs have different process routes and process times. When a job starts, workstation must be free to process the job, and as soon as it is finished, the hoist must be free to move it to the next work...

2015
Edwin Cheng

This paper demonstrates solving the flexible flow shop scheduling problem (FFSP) with considering limited waiting time constraint, sequence dependent setup times and different ready time to minimize maximum completion time (i.e. makespan). Since the problem studied is NP-hard, metaheuristic algorithms are proper to solve this class of problems. Hence, in this 1 / 4

Journal: :Advances in economics, business and management research 2023

Journal: :روش های عددی در مهندسی (استقلال) 0
عزیزاله معماریانی و قاسم مصلحی a. memariani g. moslehi

flow shop sequencing problem is included in np-hard problems and a number of heuristic methods have been developed to solve it. most of these methods are offered for the crisp processing time. however fuzzy algorithm is appropriate for the problems with fuzzy processing time. this paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...

Journal: :International Journal of Industrial Engineering Computations 2019

This study considers outsourcing decisions in a flexible flow shop scheduling problem, in which each job can be processed by either an in-house production line or outsourced. The selected objective function aims to minimize the weighted sum of tardiness costs, in-house production costs, and outsourcing costs with respect to the jobs due date. The purpose of the problem is to select the jobs tha...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید