Zhi-Long Chen Warren B. Powell

We consider the problem of scheduling multiple families of jobs on identical parallel machines to minimize the total weighted completion time of the jobs. In this problem, a setup time is necessary whenever a job from one family is processed immediately after another job from a di erent family. The setup time could be sequence independent or sequence dependent. We propose a column generation ba...

Amin-Tahmasbi, Tavakkoli-Moghaddam,

 We present a new mathematical model for a permutation flowshop scheduling problem with sequence-dependent setup times considering minimization of two objectives, namely makespan and weighted mean total earliness/tardiness. Only small-sized problems with up to 20 jobs can be solved by the proposed integer programming approach. Thus, an effective multi-objective immune system (MOIS) is ...

2010
Mário A. G. Melo Manuel J. Pereira

In this paper, we address the problem of finding a permutation schedule of n jobs in an m machine flow-shop environment that minimizes the maximum completion time Cmax (Makespan) of all jobs. The jobs are available at time zero and have sequence-dependent setup times on each machine. All parameters, such as processing and setup times, are assumed to be known with certainty. This problem is clas...

This paper considers the problem of minimizing make-span and maximum tardiness simultaneously for scheduling jobs under non-identical job sizes, dynamic job arrivals, incompatible job families,and sequence-dependentfamily setup time on the single batch- processor, where split size of jobs is allowed between batches. At first, a new Mixed Integer Linear Programming (MILP) model is proposed for t...

2008
Luigi Martino Rafael Pastor

The General Assembly Line Balancing Problem with Setups (GALBPS) was recently defined in the literature. It adds sequence-dependent setup time considerations to the classical Simple Assembly Line Balancing Problem (SALBP) as follows: whenever a task is assigned next to another at the same workstation, a setup time must be added to compute the global workstation time, thereby providing the task ...

A.M Kimiagari H Mosadegh

In this paper, the researchers have investigated a Concatenated Robot Move (CRM) sequence problem and Minimal Part Set (MPS) schedule problem with different setup times for two-machine robotic cell. They have focused on simultaneous solving of CRM sequence and MPS schedule problems with different loading and unloading times. They have applied a Simulated Annealing (SA) algorithm to provide a go...

Journal: :J. Math. Model. Algorithms 2013
Emna Dhouib Jacques Teghem Taïcir Loukil

This paper studies the permutation flowshop scheduling problem with sequence dependent setup times and time lags constraints minimizing the number of tardy jobs. Dependent setup times are defined as the work to prepare the machines between two successive jobs. Time lags are defined as intervals of time that must exist between every couple of successive operations of the same job. Two mathematic...

2009
Monika Kofler Stefan Wagner Andreas Beham Gabriel Kronberger Michael Affenzeller

Setup costs are a crucial factor in many branches of industry and frequently sequence dependent. However, the empirical acquisition of setup costs is inaccurate and not practicable for companies with large product portfolios operating in volatile markets. We therefore propose an abstract model for the estimation of such sequence dependent setup costs and subsequently apply dispatching and sched...