نتایج جستجو برای: Defective items

تعداد نتایج: 115015  

Journal: :ژورنال بین المللی پژوهش عملیاتی 0
r. uthayakumar t. sekar

in this model, we establish an inventory model to determine the optimal inventory replenishment scheme for the economic production quantity (epq) model for imperfect, deteriorating items with sales return service under multiple production and rework setup. in one cycle, production process can produces the products in m production setups and reworks the defective items in one rework setup. the c...

Journal: :international journal of supply and operations management 2014
m vijayashree r uthayakumar

in this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. the cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. lead time is an important element in any inventory system. the proposed model is presents an integrated inventory model with controllable lead tim...

Sekar, T., Uthayakumar, R.,

In this model, we establish an inventory model to determine the optimal inventory replenishment scheme for the economic production quantity (EPQ) model for imperfect, deteriorating items with sales return service under multiple production and rework setup. In one cycle, production process can produces the products in m production setups and reworks the defective items in one rework setup. The c...

Behzad Maleki Vishkaei Mehdi Ebrahimnezhad Moghadam Rashti Milad Farhangi S. T. A. Niaki

This paper is an extension of Hsu and Hsu (Int J Ind Eng Comput 3(5):939–948, 2012) aiming to determine the optimal order quantity of product batches that contain defective items with percentage nonconforming following a known probability density function. The orders are subject to 100 % screening process at a rate higher than the demand rate. Shortage is backordered, and defective items...

Fallahnezhad, Niaki,

  A novel optimal single machine replacement policy using a single as well as a two-stage decision making process is proposed based on the quality of items produced. In a stage of this policy, if the number of defective items in a sample of produced items is more than an upper threshold, the machine is replaced. However, the machine is not replaced if the number of defective items is less than ...

Journal: :journal of industrial engineering, international 2006
rasoul haji alireza haji

this paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. we have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

Alireza Haji Rasoul Haji

This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...

The basic assumption in the traditional inventory model is that all outputs are perfect items. However, this assumption is too simplistic in the most real-life situations due to a natural phenomenon in a production process. From this it is deduced that the system produces non-perfects items which can be classified into four groups of perfect, imperfect, reworkable defective and non-reworkable d...

In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...

Journal: :Acta Cybern. 2015
Sándor Z. Kiss Éva Hosszu Lajos Rónyai János Tapolcai

In traditional Combinatorial Group Testing the problem is to identify up to d defective items from a set of n items on the basis of group tests. In this paper we describe a variant of the group testing problem above, which we call parity group testing. The problem is to identify up to d defective items from a set of n items as in the classical group test problem. The main difference is that we ...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید