نتایج جستجو برای: non dominated sorting firefly algorithm

تعداد نتایج: 2058130  

This paper introduces a novel multi-objective evolutionary algorithm based on cat swarm optimizationalgorithm (EMCSO) and its application to solve a multi-objective knapsack problem. The multi-objective optimizers try to find the closest solutions to true Pareto front (POF) where it will be achieved by finding the less-crowded non-dominated solutions. The proposed method applies cat swarm optim...

Journal: :modeling and simulation in electrical and electronics engineering 2015
seyed hasan mirhoseini seyed mehdi hosseini mehdi ghanbari majid gandomkar

in this paper, a multi-objective reconfiguration problem has been solved simultaneously by a modified ant colony optimization algorithm. two objective functions, real power loss and energy not supplied index (ens), were utilized. multi-objective modified ant colony optimization algorithm has been generated by adding non-dominated sorting technique and changing the pheromone updating rule of ori...

Integrated production-distribution planning (PDP) is one of the most important approaches in supply chain networks. We consider a supply chain network (SCN) to consist of multi suppliers, plants, distribution centers (DCs), and retailers. A bi-objective mixed integer linear programming model for integrating production-distribution designed here aim to simultaneously minimize total net costs in ...

Journal: :Periodicals of Engineering and Natural Sciences (PEN) 2023

Focusing on production processes is the decisive factor in managing an efficient supply chain that leads to company's success. The objective constraints model include all goals company seeks achieve and level for each. In addition clarifying contribution of each decision variable achieving specified levels different goals, conclusions reached are results prove possibility solving a problem. App...

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید