نتایج جستجو برای: project scheduling

تعداد نتایج: 310880  

2003
R. Leus

In a recent paper Wei, Liu and Tsai present an ‘‘advanced TOC method for project scheduling under resource constraints’’. In this note we demonstrate that the authors (a) largely ignore the state of the art in resource-constrained project scheduling, (b) do not offer a correct application of the critical chain scheduling concepts, and (c) describe an alternative scheduling approach that is not ...

2006
Michael L. Pinedo

“Planning and Scheduling in Manufacturing and Services” written by Michael L. Pinedo and published in the Springer Series in Operations Research is a recent book intended for a senior level or master level course on planning and scheduling either in an engineering or a business school. The book consists of four parts. Part I introduces the main features of scheduling models in manufacturing and...

2008
Lai-Hsi Lee

Project preemption allows resources flow passively from one project or task to another. Due to high-cost and high-risk characteristics of software development, project preemption might have a significant impact on the ultimate completion time of a software project. This article examines the feasibility of the Taguchi’s parameter design to achieve robust resource assignment for multiple software...

1999
HONGQI PAN ROBERT J. WILLIS CHUNG-HSING YEH

Resource-constrained project scheduling (RCPS) is often a challenging issue in practice, due to its combinatorial nature and uncertainty. This paper presents the framework of a heuristic approach to fuzzy RCPS problems using a fuzzy parallel scheduling method. This approach can handle both fuzzy and crisp numbers which commonly coexist in many realistic RCPS problems. Key-Words: Resource-constr...

Journal: :مهندسی صنایع 0
یعقوب قلی پور 1 school of civil engineering mohammad mehdi shahbazi engineering optimization research group

during the implementation, construction projects usually encounter situation that considerably affects the project scheduling and cost. this study aims at using an improved version of the harmony search algorithm (hsa) to schedule resource constrained construction projects. this model is formulated as a global optimization problem. it will determine the duration of each activity to minimize the...

1995
F. S.

we consider a functional equation that arises in problems of scheduling with priorities and earliness/lateness penalties. We solve the equation and note how it can be used to analyze the invariance of conclusions about optimality of a schedule if the scale used to measure priority is replaced by another acceptable scale. Keywords-Scheduling, Functional equations, Measurement theory, Penalty fun...

1999
Karl-Erik Årzén Bo Bernhardsson Johan Eker Anton Cervin Patrik Persson Klas Nilsson Lui Sha

The report gives a state-of-the-art survey of the field of integrated control and scheduling. Subtopics discussed are implementation and scheduling of periodic control loops, scheduling under overload, control and scheduling co-design, dynamic task adaptation, feedback scheduling, and scheduling of imprecise calculations. The report also presents the background, motivation, and research topics ...

S.M.T Fatemi Ghomi S.S Hashemin

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

Ahmad Soltani Rasoul Haji

In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modif...

Journal: :مهندسی صنایع 0
جعفر باقری نژاد استادیار دانشکده مهندسی صنایع - دانشگاه الزهرا (س) فریبرز جولای استاد دانشکده مهندسی صنایع -پردیس دانشکده های فنی-دانشگاه تهران زهرا رفیعی مجد کارشناس ارشد مهندسی صنایع - دانشگاه الزهرا (س)

in this study, we present a mrcpsp/max (multi-mode resource-constrained project scheduling problem with minimum and maximum time lags) model with minimization tardiness costs and maximization earliness rewards of activities as objective. the proposed model is nearby to real-world problems and has wide applications in various projects. this problem is not available in the literature exactly and ...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید