A branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem

نویسندگان

  • Morteza Barzoki Department of Industrial and Systems Engineering, Isfahan University of Technology, Isfahan 84156-83111, Iran
  • Seyed Reza Hejazi Department of Industrial and Systems Engineering, Isfahan University of Technology, Isfahan 84156-83111, Iran
چکیده مقاله:

In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery.  jobs have to be scheduled on a single machine and delivered to  customers for further processing in batches. The objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. In this paper, we present a heuristic algorithm (HA) and a branch and bound (B&B) method for the restricted case, where the tardy jobs are delivered separately, and compare these procedures with an existing dynamic programming (DP) algorithm by computational tests. The results of computational tests show significant improvement of the B&B over the dynamic programming algorithm.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Batch scheduling to minimize the weighted number of tardy jobs

In this paper, we address a single-machine scheduling problem with due dates and batch setup times to minimize the weighted number of tardy jobs. We give a pseudo-polynomial dynamic program and a fully-polynomial approximation scheme for the case where the due dates are uniform within a family. 2007 Elsevier Ltd. All rights reserved.

متن کامل

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs

We consider the feasibility model of multi-agent scheduling on a single machine, where each agent’s objective function is to minimize the total weighted number of tardy jobs. We show that the problem is strongly NP-complete in general. When the number of agents is fixed, we first show that the problem can be solved in pseudo-polynomial time for integral weights, and can be solved in polynomial ...

متن کامل

Design of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System

This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...

متن کامل

A modified branch and bound algorithm for a vague flow-shop scheduling problem

Uncertainty plays a significant role in modeling and optimization of real world systems. Among uncertain approaches, fuzziness describes impreciseness while for ambiguity another definition is required. Vagueness is a probabilistic model of uncertainty being helpful to include ambiguity into modeling different processes especially in industrial systems. In this paper, a vague set based on dista...

متن کامل

Metaheuristics for scheduling on parallel machine to minimize weighted number of early and tardy jobs

This paper considers the scheduling of n jobs on m parallel machines to minimize the weighted number of early and tardy jobs. The single machine case of this problem has been shown to be NPcomplete in the strong sense. This problem on m parallel machine is also NP complete in the strong sense and finding an optimal solution appears unlikely. The problem is formulated as an integer linear progra...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 10  شماره Issue 1

صفحات  50- 60

تاریخ انتشار 2017-04-19

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023