In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, this proposed mathematical model has suitable efficiency for solving small instances. Two versions of imperialist competitive algorithm (ICA) are presented to heuristically solve the problem. The grouping version of  algorithm (G-ICA) is used to solve the large-sized instances based on considering the allocation of trucks as a grouping problem. Effectiveness of the proposed metaheuristics on small-sized problems is compared with the optimal results of the mathematical model. In order to compare the efficiency of the proposed algorithms for large-sized instances, several instances were generated and solved, and the performance of algorithms has been compared with each other. Moreover, a simulated annealing (SA) algorithm is developed to solve the problem and evaluate the performance of the proposed ICA algorithms. Based on the experimental results, the G-ICA has a better performance compared to the ICA and SA. Also an instance of a container terminal in Iran has been investigated which shows that the proposed model and solution methods are applicable in real-world problems.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption

Container terminals mainly include three types of handling equipment, i.e., quay cranes (QCs), internal trucks (ITs) and yard cranes (YCs). Due to high cost of the handling equipment, container terminals can hardly purchase additional handling equipment. Therefore, the reasonable scheduling of these handling equipment, especially coordinated scheduling of the three types of handling equipment, ...

متن کامل

The Integrated Optimization of Quay Crane-Yard Truck Scheduling in the Container Terminal with Uncertain Factors

The key to improve the container terminal efficiency is the integrated optimization of the quay crane (QC) and the yard truck (YT) scheduling, which is normally settled separately and considered in a certain condition in classical literatures. To improve the operation efficiency and simulate the practical operation, a PSO-based integrated QC-YT scheduling optimization model with uncertain facto...

متن کامل

Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals

A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...

متن کامل

Addressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm

Nowadays, there is much attention for planning of container terminals in the global trade centers. The high cost of quay cranes motivates both scholars and industrial practitioners especially in the last decade to develop novel optimization models to address this dilemma. This study proposes a coordinated optimization model to cover both Quay Crane Scheduling Problem (QCSP) and Quay Crane Assig...

متن کامل

An evolutionary approach to solving a new integrated quay crane assignment and quay crane scheduling mathematical model

This paper puts forward an integrated optimisation model that combines two distinct problems arising in container terminals, namely the Quay Crane Assignment Problem, and the Quay Crane Scheduling Problem. The model is of the mixed-integer programming type with the objective being to minimise the tardiness of vessels. Although exact solutions can be found to the problem using Branch-and-Cut, fo...

متن کامل

An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports

This paper presents a novel, mixed-integer programming (MIP) model for the quay crane (QC) scheduling and assignment problem, namely QCSAP, in a container port (terminal). Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper, thus, proposes a genetic ...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 32  شماره 10

صفحات  1464- 1479

تاریخ انتشار 2019-10-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023