A Multi-Objective Mixed-Model Assembly Line Sequencing Problem With Stochastic Operation Time

نویسندگان

  • Arezoo Askari MSc, Department of Industrial Engineering, Bu-Ali Sina University, Hamedan, Iran
  • Parviz Fattahi Associate Professor, Department of Industrial Engineering, Alzahra University, Tehran, Iran
چکیده مقاله:

In today’s competitive market, those producers who can quickly adapt themselves todiverse demands of customers are successful. Therefore, in order to satisfy these demands of market, Mixed-model assembly line (MMAL) has an increasing growth in industry. A mixed-model assembly line (MMAL) is a type of production line in which varieties of products with common base characteristics are assembled on. This paper focuses on this type of production line in a stochastic environment with three objective functions: 1) total utility work cost, 2) total idle cost, and 3) total production rate variation cost that are simultaneously considered.  In real life, especially in manual assembly lines, because of some inevitable human mistakes, breakdown of machines, lack of motivation in workers and the things alike, events are notdeterministic, sowe consideroperation time as a stochastic variable independently distributed with normal distributions; for dealing with it, chance constraint optimization is used to model the problem. At first, because of NP-hard nature of the problem, multi-objective harmony search (MOHS) algorithm is proposed to solve it. Then, for evaluating the performance of the proposed algorithm, it is compared with NSGA-II that is a powerful and famous algorithm in this area. At last, numerical examples for comparing these two algorithms with some comparing metrics are presented. The results have shown that MOHS algorithm has a good performance in our proposed model.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving a multi-objective mixed-model assembly line balancing and sequencing problem

This research addresses the mixed-model assembly line (MMAL) by considering various constraints. In MMALs, several types of products which their similarity is so high are made on an assembly line. As a consequence, it is possible to assemble and make several types of products simultaneously without spending any additional time. The proposed multi-objective model considers the balancing and sequ...

متن کامل

A Multi-objective Mixed Model Two-sided Assembly Line Sequencing Problem in a Make –To- Order Environment with Customer Order Prioritization

Mixed model two-sided assembly lines (MM2SAL) are applied to assemble large product models, which is produced in high-volume. So, the sequence planning of products to reduce cost and increase productivity in this kind of lines is imperative. The presented problem is tackled in two steps. In step 1, a framework is developed to select and prioritize customer orders under the finite capacity of th...

متن کامل

A Multi-Objective Particle Swarm Optimization for Mixed-Model Assembly Line Balancing with Different Skilled Workers

This paper presents a multi-objective Particle Swarm Optimization (PSO) algorithm for worker assignment and mixed-model assembly line balancing problem when task times depend on the worker’s skill level. The objectives of this model are minimization of the number of stations (equivalent to the maximization of the weighted line efficiency), minimization of the weighted smoothness index and minim...

متن کامل

Solving a multi-objective mixed-model assembly line balancing and sequencing problem

This research addresses the mixed-model assembly line (MMAL) by considering various constraints. In MMALs, several types of products which their similarity is so high are made on an assembly line. As a consequence, it is possible to assemble and make several types of products simultaneously without spending any additional time. The proposed multi-objective model considers the balancing and sequ...

متن کامل

A multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation

Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...

متن کامل

Genetic and Memetic Algorithms for Sequencing a New JIT Mixed-Model Assembly Line

This paper presents a new mathematical programming model for the bi-criteria mixed-model assembly line balancing problem in a just-in-time (JIT) production system. There is a set of criteria to judge sequences of the product mix in terms of the effective utilization of the system. The primary goal of this model is to minimize the setup cost and the stoppage assembly line cost, simultaneously. B...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 11  شماره 1

صفحات  157- 167

تاریخ انتشار 2018-03-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023