Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method

نویسندگان

چکیده مقاله:

Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The primary objective of this paper is to identify and rank the risks in these power plant projects. The proposed model allows risks to be ranked based on management priorities using a combined fuzzy analytic network process (fuzzy-ANP) and fuzzy Technique for Order Preference by Similarity to Ideal Solution (fuzzy-TOPSIS) method. Probability and impact are two commonly used criteria in project risk management. However, these criteria do not sufficiently address all aspects of project risk. Moreover, there may be relations and dependencies among the various criteria.  Therefore, we proposed a hierarchical structure for ranking risk in power-plant projects. The proposed structure can consider dependence among the different criteria. We use fuzzy-ANP for calculating weights. The outputs of fuzzy-ANP calculations are used in a fuzzy-TOPSIS procedure for the evaluation of important risks. A case study of a power plant project is presented to demonstrate the applicability and performance of the proposed model. More than 100 risks were identified and categorized according to their source and to their relative impact on the project. We evaluated important risks based on the fuzzy-ANP and fuzzy-TOPSIS method. In addition, we used a sensitivity analysis to discuss and explain the results of the method. The proposed method is a suitable approach when performance ratings and weights are vague and imprecise

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Using fuzzy FMEA and fuzzy logic in project risk management

Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...

متن کامل

An Integrated Approach of Fuzzy ANP and Fuzzy TOPSIS for R&D Project Selection: A Case Study

This paper presents an integrated fuzzy approach for selecting R&D project. In the integrated approach, fuzzy concepts are used for decision-makers’ subjective judgments to reflect the vague nature of the selection process. Fuzzy ANP and Fuzzy TOPSIS are included in the integrated approach. Fuzzy ANP is used to determine the fuzzy weights of criteria and sub-criteria. Fuzzy TOPSIS aims to rank ...

متن کامل

Development of a human error risk assessment model in high priority emergency situation using TOPSIS, FUZZY-AHP and CREAM method

Introduction: Emergencies are unforeseen and unpredictable situations. In these situations, people’s performance is affected by various factors that cause stress. People’s performance in such situations can also affect human error probability. The purpose of this study was to evaluate human error in emergency situations based on the fuzzy CREAM and Fuzzy Analytical Hierarchy Process (FAHP). Ma...

متن کامل

A Hybrid MCDM Approach Based on Fuzzy ANP and Fuzzy TOPSIS for Technology Selection

In order to compete in the global environment, a manufacturing company has to keep developing new technologies. Selection of a right technology is a critical stage in a successful technology transfer process. However, technology selection is a complex multi-dimensional problem including both qualitative and quantitative factors, such as human resources, operational and financial dimensions, whi...

متن کامل

Project Selection by Using a Fuzzy TOPSIS Technique

Selection of a project among a set of possible alternatives is a difficult task that the decision maker (DM) has to face. In this paper, by using a fuzzy TOPSIS technique we propose a new method for a project selection problem. After reviewing four common methods of comparing investment alternatives (net present value, rate of return, benefit cost analysis and payback period) we use them as cri...

متن کامل

Project Selection by Using Fuzzy AHP and TOPSIS Technique

In this article, by using fuzzy AHP and TOPSIS technique we propose a new method for project selection problem. After reviewing four common methods of comparing alternatives investment (net present value, rate of return, benefit cost analysis and payback period) we use them as criteria in AHP tree. In this methodology by utilizing improved Analytical Hierarchy Process by Fuzzy set theory, first...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 25  شماره 2

صفحات  107- 120

تاریخ انتشار 2012-05-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023