Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

نویسندگان

  • Azam Sadati Department of Industrial Engineering, Islamic Azad University
چکیده مقاله:

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programming (MILP) is considered then solved with the ε-constraint method in small-sized problems.The related results are compared with the results obtained by meta-heuristic algorithms.Furthermore, an effectivehybrid multi-objective teaching–learningbased optimization (HMOTLBO) algorithm is proposed, whose performance is compared with a non-dominated sorting genetic algorithm (NSGA-II) fortest problems generated at random. The associated results show that the proposed HMOTLBO outperformsthe NSGA-II in terms of different metrics.

Download for Free

Sign up for free to access the full text

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 30  شماره 2

صفحات  224- 233

تاریخ انتشار 2017-02-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023