Bahman naderi

Assistant Professor, Department of Industrial Engineering, Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran

[ 1 ] - Modelling and Scheduling Lot Streaming Flexible Flow Lines

Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...

[ 2 ] - The project portfolio selection and scheduling problem: mathematical model and algorithms

This paper investigates the problem of selecting and scheduling a set of projects among available projects. Each project consists of several tasks and to perform each one some resource is required. The objective is to maximize total benefit. The paper constructs a mathematical formulation in form of mixed integer linear programming model. Three effective metaheuristics in form of the imperialis...

[ 3 ] - َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...

[ 4 ] - A Mathematical Model and a Solution Method for Hybrid Flow Shop Scheduling

This paper studies the hybrid flow shop scheduling where the optimization criterion is the minimization of total tardiness. First, the problem is formulated as a mixed integer linear programming model. Then, to solve large problem sizes, an artificial immune algorithm hybridized with a simple local search in form of simulated annealing is proposed. Two experiments are carried out to evaluate th...

[ 5 ] - Multi objective organ transplant supply chain with effective location and time consideration

Nowadays, working alone on a context is not sufficient and reaching good and worthy results demands cooperation of multi sciences. Healthcare supply chain is one of these sciences that bridges engineering and healthcare sciences. This paper proposes a new multi–objective model for organ transplant supply chain, which is one of consequential fields in Healthcare supply chain, by aiming at having...

[ 6 ] - مدل‌سازی زمان‌بندی و اندازه انباشته اقتصادی در جریان کارگاهی جایگشتی توزیع‌شده با کارخانه‌های متفاوت

این مقاله مدل جدید زمانبندی و اندازه انباشته اقتصادی در جریان کارگاهی جایگشتی توزیع شده با چندین کارخانه و ماشین متفاوت را نشان می‌دهد که تا کنون این موضوع مدنظر قرار نگرفته است. بدین منظور، محصولات متفاوت باید در بین کارخانه‌ها توزیع شود و سپس توالی محصولات تخصیصی به هر کارخانه نیز مشخص شود. هدف مسئله، حداقل کردن مجموع هزینه‌های راه اندازی، موجودی در جریان و موجودی محصول نهایی در واحد زمان و ه...

[ 7 ] - A Resilient Supply Chain Network Design Model with a Novel Fuzzy Programming Method under Uncertainty and Disruptions: A Real Industrial Approach

Nowadays, the design of a strategic supply chain network under the incidence of disruption is regarded as one of the important priorities of governments. Supplying sustainable petrochemical products is considered as a strategic goal by managers who require reliable infrastructure design. Crisis conditions such as natural disasters and sanctions have a destructive effect on the raw materials and...

[ 9 ] - A New Combination of Robust-possibilistic Mathematical Programming for Resilient Supply Chain Network under Disruptions and Uncertainty: A Real Supply Chain (RESEARCH NOTE)

Nowadays, the design of a strategic supply chain network under disruption is one of the most important priorities of the governments. One of the strategic purposes of managers is to supply the sustainable agricultural products and food in stable conditions which require the production of soil nutrients. In this regard, some disruptions such as sanctions and natural disasters have a destructive ...

[ 10 ] - A Scheduling Model of Flexible Manufacturing System to Reduce Waste and Earliness/Tardiness Penalties

Nowadays, flexible manufacturing system (FMS) is introduced as a response to the competitive environment. Scheduling of FMS is more complex and more difficult than the other scheduling production systems. One of the main factors in scheduling of FMS is variable time of taking orders from customers, which leads to a sudden change in the manufacturing process. Also, some problems are created in p...

[ 11 ] - Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...