The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System

نویسندگان

  • Iraj Mahdavi Department of Industrial Engineering, Mazandaran University of Science and Technology, Babol, Iran
  • Javad Rezaeian Department of industrial engineering, Mazandaran University of Science and Technology, Babol, Iran
  • Sadegh Hosseini-Kia Department of Industrial Engineering, Mazandaran University of Science and Technology, Babol, Iran.
چکیده مقاله:

Flow shop scheduling problem has a wide application in the manufacturing and has attracted much attention in academic fields. From other point, on time delivery of products and services is a major necessity of companies’ todays; early and tardy delivery times will result additional cost such as holding or penalty costs.  In this paper, just-in-time (JIT) flow shop scheduling problem with preemption and machine idle time assumptions is considered in which objective function is minimizing the sum of weighted earliness and tardiness. A new non-linear mathematical model is formulated for this problem and due to high complexity of the problem meta-heuristic approaches have been applied to solve the problem for finding optimal solution. The parameters of algorithms are set by Taguchi method. Each parameter is tested in three levels. By implementation of many problems with different sizes these levels are determined .The proposed model is solved by three meta-heuristic algorithms: genetic algorithm (GA), imperialist competitive algorithm (ICA) and hybrid of GA and ICA. To evaluate the performance of the proposed algorithms many test problems have been designed. The Computational results indicate the superiority of the performance of hybrid approach than GA and ICA in finding thebest solution in reasonable computational time.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

Bi-objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem

This paper considers a two-stage assembly flow shop problem (TAFSP) where m machines are in the first stage and an assembly machine is in the second stage. The objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. JIT seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...

متن کامل

Flow shop Scheduling Problem with Maintenance Coordination: a New Approach

This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...

متن کامل

A Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs

This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...

متن کامل

bi-objective optimization for just in time scheduling: application to the two-stage assembly flow shop problem

this paper considers a two-stage assembly flow shop problem (tafsp) where m machines are in the first stage and an assembly machine is in the second stage. the objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. jit seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...

متن کامل

On The Parameterized Tractability of the Just-In-Time Flow-Shop Scheduling Problem

Since its development in the early 90’s, parameterized complexity has been widely used to analyze the tractability of many NP-hard combinatorial optimization problems with respect to various types of problem parameters. While the generic nature of the framework allows the analysis of any combinatorial problem, the main focus along the years was on analyzing graph problems. In this paper we dive...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ذخیره در منابع من قبلا به منابع من ذحیره شده

{@ msg_add @}


عنوان ژورنال

دوره 12  شماره 2

صفحات  79- 92

تاریخ انتشار 2019-07-01

با دنبال کردن یک ژورنال هنگامی که شماره جدید این ژورنال منتشر می شود به شما از طریق ایمیل اطلاع داده می شود.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023