Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

N. Chiadamrong V. Piyathanavong

Models that aim to optimize the design of supply chain networks have gained more interest in the supply chain literature. Mixed-integer linear programming and discrete-event simulation are widely used for such an optimization problem. We present a hybrid approach to support decisions for supply chain network design using a combination of analytical and discrete-event simulation models. The prop...

2012

Earthmoving operations are a major part of many construction projects. Because of the complexity and fast-changing environment of such operations, the planning and estimating are crucial on both planning and operational levels. This paper presents the framework ofa microscopic discrete-event simulation system for modeling earthmoving operations and conducting productivity estimations on an oper...

Journal: :amirkabir international journal of modeling, identification, simulation & control 2015
i. bossaghzadeh s. r. hejazi z. pirmoradi

a common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. as a result, project managers are often unable to meet the deadline time of the milestones. robust project scheduling is an effective approach in case of uncertainty. upon adopting this approach, schedules are protected against po...

2004
Achim Streit

The self-tuning dynP scheduler for modern cluster resource management systems switches between different basic scheduling policies dynamically during run time. This allows to react on changing characteristics of the waiting jobs. In this paper we present enhancements to the decision process of the self-tuning dynP scheduler and evaluate their impact on the performance: (i) While doing a self-tu...

2009
Ankush Bhagat Shengyong Wang Mohammad T. Khasawneh

Hospital health information management (HIM) typically involves a number of stages, including medical records coding, processing, analyzing, archival, and retrieval. The exponential increase in healthcare spending, the need for quicker medical expense reimbursement, and the elevated security requirements for the sharing of medical records have added to the complexity and challenges of HIM. More...

Journal: :Brazilian Journal of Operations & Production Management 2016

Journal: :journal of optimization in industrial engineering 2010
behrouz afshar nadjafi shahram shadrokh

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

2014
Nancy Bienert Joey Mercer Jeffrey Homola Susan Morey Thomas Prevôt

This paper presents a case study of how factors such as wind prediction errors and metering delays can influence controller performance and workload in Human-In-The-Loop simulations. Retired air traffic controllers worked two arrival sectors adjacent to the Atlanta terminal area. The main tasks were to provide safe air traffic operations and deliver the aircraft to the metering fix within ±25 s...

The purpose of this study was to identify the key factors in implementing the organization's resource planning system in Chaharmahal and Bakhtiari Saderat Bank using theme analysis method. This research was a type of qualitative research that was done in an applied way. The research population consists of 15 experts and specialist in system implementation, resource planning in Chaharmahal and B...