In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexibl...
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...
This paper describes an order release and loading technique, which considers the routing as well as the machine flexibility of a modern job shop production. The workload control approach involves three steps. In a first step 'lead orders', i.e. urgent production orders that are either processed on a known bottleneck or are of high value, are identified. Afterwards transfer batches of the lead p...
The flexible job shop scheduling problem (FJSP) is a generalization of the classical job shop scheduling problem that allows to process operations on one machine out of a set of alternative machines. The FJSP is an NP-hard problem consisting of two sub-problems, which are the assignment and the scheduling problems. In this paper, we propose how to solve the FJSP by hybrid metaheuristics-based c...
زمانبندی تخصیص منابع در طول زمان برای اجرای مجموعه ای از وظایف است . مساله تک ماشین عبارت است از زمانبندی n کار روی یک ماشین، طوریکه هر کار i در زمان معین ai جهت اجرا روی ماشین آماده می باشد، به این معنی که تا قبل از زمان ai قابل دسترسی نیست و همچنین به اندازه di زمان لازم است تا آن کار انجام گیرد. از طرفی پس از اتمام کار i روی ماشین به اندازه qi زمان لازم است تا کار مربوطه تمام شده تلقی گردد. ...
A MILP model for an extended version of the Flexible Job Shop Scheduling problem is proposed. The extension allows the precedences between operations of a job to be given by an arbitrary directed acyclic graph rather than a linear order. The goal is the minimization of the makespan. Theoretical and practical advantages of the proposed model are discussed. Numerical experiments show the performa...
A MILP model for an extended version of the Flexible Job Shop Scheduling problem is proposed. The extension allows the precedences between operations of a job to be given by an arbitrary directed acyclic graph rather than a linear order. The goal is the minimization of the makespan. Theoretical and practical advantages of the proposed model are discussed. Numerical experiments show the performa...
In this paper, we analyze the characteristics of the dynamic job shop scheduling problem when machine breakdown and new job arrivals occur. A hybrid approach involving neural networks(NNs) and geneticalgorithm(GA) is presented to solve the dynamic job shop scheduling problem as a static scheduling problem. The objective of this kind of job shop scheduling problem is minimizing the completion ti...