Journal: :Expert Syst. Appl. 2008
Der-Fang Shiau Shu-Chen Cheng Yueh-Min Huang

The proportionate flow shop (PFS) is considered as a unique case of the flow shop problem in which the processing times of the operations belonging to the same job are equal. A proportionate flexible flow shop (PFFS) is a machine environment with parallel identical machines at each stage. This study presents an effective hybrid approach based on constructive genetic algorithm (CGA) for PFFS sch...

2008
A. Zinflou C. Gagné

In many industrial sectors, decision makers are faced with large and complex problems that are often multi-objective. Many of these problems may be expressed as a combinatorial optimization problem in which we define one or more objective functions that we are trying to optimize. Thus, the car sequencing problem in an assembly line is a well known combinatorial optimization problem that cars ma...

This paper presents a bi-objective MIP model for the flexible flow shop scheduling  problem (FFSP) in which the total weighted tardiness and the energy consumption are minimized simultaneously. In addition to considering unrelated machines at each stage, the set-up times are supposed to be sequence- and machine-dependent, and it is assumed that jobs have different release tim...

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...

Journal: :مهندسی صنایع 0
سیدعلی ترابی دانشگاه تهران مسعود جنابی دانشگاه صنعتی امیرکبیر

in this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. single supplier via a flexible flow line production system (ffl) produces several items and delivers them directly to an assembly facility. based on basic period (bp) strategy, a new mixed zero-one nonlinear programming model has been develope...

Journal: :European Journal of Operational Research 2003
Michel Gourgand Nathalie Grangeon Sylvie Norre

This paper deals with performance evaluation and scheduling problems in m machine stochastic flow shop with unlimited buffers. The processing time of each job on each machine is a random variable exponentially distributed with a known rate. We consider permutation flow shop. The objective is to find a job schedule which minimizes the expected makespan. A classification of works about stochastic...

Farzaneh Abyaneh Saeedeh Gholami,

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

G. Moslehi and M. Mahnam,

While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...