نتایج جستجو برای: due dates completion time genetic algorithm ga

تعداد نتایج: 3659140  

Journal: :journal of agricultural science and technology 2010
s. m. hosseini b. zahraie

this study is focused on developing an integrated optimization-simulation based genetic algorithm model (iosga) to develop the operational policies for a multi-purpose reservoir system. the objective function of the optimization model is considered to be a linear function of reliability (rel), resiliency (res), and vulnerability (vul) of the river-reservoir system. genetic algorithm (ga) is emp...

Journal: :ژورنال بین المللی پژوهش عملیاتی 0
r. ramezanian

in this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. we concern rework in the scheduling environment and propose a mixed-integer programming (mip) model for the problem.  based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...

2013
Saleem Z. Ramadan Gürsel A. Süer

In this paper a genetic algorithm (GA) with dualfitness function is proposed and applied to solve the deterministic identical machine scheduling problem. The mating fitness function value was used to determine the mating for chromosomes, while the selection fitness function value was used to determine their survivals. The performance of this algorithm was tested on deterministic identical machi...

ژورنال: محاسبات نرم 2016

Abstract Link prediction in social networks is one of the most important activities in analysis of such networks. The importance of link prediction in social networks is due to its dynamic nature. While members and their relationships (links) in such networks are continuously increasing, links may be missed due to various reasons. By predicting such links, the possibility of extension, compl...

This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...

2014
Dhingra

In the present work, SDST flow shop scheduling with minimizing the weighted sum of total weighted tardiness and makespan have been considered simultaneously. Four modified heuristic have been proposed for preliminary viable sequence. Sequence obtained from the modified heuristics is combined with the initial seed sequence of genetic algorithm and called as Genetic Algorithm (GA). Hence four dif...

Journal: :international journal of advanced design and manufacturing technology 0
sahar safaei industrial management department faculty of management and accounting, shahid beheshti university,tehran, iran. reihane naderi industrial management department faculty of economics and management, semnan university, iran. amir sohrabi assistant professor in molecular medicine department of molecular biology, research center of health reference laboratory, ministry of health and medical education,tehran, iran. amin hatami business management department faculty of management and accounting, farabi college, university of tehran, iran

abstract: this paper considers the problem of scheduling n jobs on m unrelated parallel machines with sequence-dependent setup times. to better comply with industrial situations, jobs have varying due dates and ready times and there are some precedence relations between them. furthermore sequence-dependent setup times and anticipatory setups are included in the proposed model. the objective is ...

R. Ramezanian,

In this paper, we consider a flow shop scheduling problem with availability constraints (FSSPAC) for the objective of minimizing the makespan. In such a problem, machines are not continuously available for processing jobs due to preventive maintenance activities. We proposed a mixed-integer linear programming (MILP) model for this problem which can generate non-permutation schedules. Furthermor...

2002
Suk-Hun Yoon José A. Ventura

A hybrid genetic algorithm (HGA) approach is proposed for a lot-streaming flow shop scheduling problem, in which a job (lot) is split into a number of smaller sublots so that successive operations can be overlapped. The objective is the minimization of the mean weighted absolute deviation of job completion t imes from due dates.

1996
Andreas S. Schulz

There has been recent success in using polyhedral formulations of scheduling problems not only to obtain good lower bounds in practice but also to develop provably good approximation algorithms. Most of these formulations rely on binary decision variables that are a kind of assignment variables. We present quite simple polynomial-time approximation algorithms that are based on linear programmin...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید