Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...

Ahmad Soltani Rasoul Haji

In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modif...

Journal: :IEEE transactions on systems, man, and cybernetics. Part B, Cybernetics : a publication of the IEEE Systems, Man, and Cybernetics Society 2001
Shyi-Ming Chen Tao-Hsing Chang

Program evaluation and review techniques (PERT) is an efficient tool for large project management. In actual project control decisions, PERT has successfully been applied to business management, industry production, project scheduling control, logistics support, etc. However, classical PERT requires a crisp duration time representation for each activity. This requirement is often difficult for ...

Journal: :Journal of Construction Engineering and Management 2004

Journal: :IJFSA 2012
Sireesha Veeramachaneni N. Ravi Shankar K. Srinivasa Rao P. Phani Bushan Rao

In this paper, the authors propose a new method to compute the fuzzy latest times and float times of activities for a project scheduling problem with fuzzy activity times. The authors have considered LR fuzzy numbers to represent the activity times. As the data of the problem are LR fuzzy numbers, the authors have shown that the results are also in terms of LR fuzzy numbers. Total float time of...

2015
Daniyar Artykov Lyazzat Atymtayeva

In this paper, first the problems that might be faced by project managers during project management period presented. The main goal of our research is development of intelligent application that based on a fuzzy linear programming approach. Intelligent application should find the optimal scheduling of project activities. We take duration of the project activity as a fuzzy random variable, and t...

2010
N. Shahsavari M. Modarres R. Tavakoli Moghadam

Correct scheduling of the project is the necessary condition for the project success. In traditional models, the activities duration times are deterministic and known. In real world however, accurate calculation of time for performing each activity is not possible and is always faced with uncertainty. In this paper, the duration of each activity is estimated by the experts as linguistic variabl...