This paper presents an exact model for the resource investment problem with generalized precedence relations in which the minimum or maximum time lags between a pair of activities may vary depending on the chosen modes. All resources considered are renewable. The objective is to determine a mode and a start time for each activity so that all constraints are obeyed and the resource investment co...

Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each act...

Journal: :international journal of optimaization in civil engineering 0
e. hemat m.v.n. sivakumar

critical path method (cpm) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. despite its popularity, cpm has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. the analytical competency and computing capability of cpm thus...

Journal: :Journal of Experimental Biology 2008

A. Afshar, E. Kalhor,

In this paper, an efficient multi-objective model is proposed to solve time-cost trade off problem considering cash flows. The proposed multi-objective meta-heuristic is based on Ant colony optimization and is called Non Dominated Archiving Ant Colony Optimization (NAACO). The significant feature of this work is consideration of uncertainties in time, cost and more importantly interest rate. A ...

Journal: :Canadian Journal of Civil Engineering 2019