نتایج جستجو برای: bound algorithm

تعداد نتایج: 907664  

Journal: :journal of optimization in industrial engineering 2010
mehrzad abdi khalife babak abbasi amirhossein kamali dolat abadi

in this paper, we considered solving approaches to flexible job shop problems. makespan is not a good evaluation criterion with overlapping in operations assumption. accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. as overlapping in operations is a practical assumption in chemical, petrochemical, and gla...

Journal: :international journal of industrial engineering and productional research- 0
parviz fattahi hamedan bahman ismailnezhad hamedan

in this paper, a stochastic cell formation problem is studied using queuing theory framework and considering reliability. since cell formation problem is np-hard, two algorithms based on genetic and modified particle swarm optimization (mpso) algorithms are developed to solve the problem. for generating initial solutions in these algorithms, a new heuristic method is developed, which always cre...

Journal: :نشریه مهندسی عمران و نقشه برداری 0
فرج الله عسکری پژوهشگاه زلزله اورنگ فرزانه دانشگاه تهران مسعود فاضلی نیا دانشگاه تهران

this paper deals with three-dimensional evaluation of the slopes on the basis of limit analysis. an upper-bound technique of limit analysis is used in this paper to determine either the bearing capacity of a shallow foundation near a slope or the safety factor of the slope. the theorems of limit analysis (upper and lower bound) provide a powerful tool for solving problems in which limit loads n...

O. Hasançebi, S. Kazemzadeh Azad,

The present study attempts to apply an efficient yet simple optimization (SOPT) algorithm to optimum design of truss structures under stress and displacement constraints. The computational efficiency of the technique is improved through avoiding unnecessary analyses during the course of optimization using the so-called upper bound strategy (UBS). The efficiency of the UBS integrated SOPT algori...

Journal: :journal of sciences, islamic republic of iran 2012
f. moeen moghadas

we consider the queueing maximal covering location-allocation problem (qm-clap) with an m/m/1 queueing system. we propose a new solution procedure based on decomposition of the problem into smaller sub-problems. we solve the resulting sub-problems both with a branch and bound algorithm and with the meta-heuristic grasp. we also solve the entire model with grasp. computational results for these ...

‎A full Nesterov-Todd (NT) step infeasible interior-point algorithm‎ ‎is proposed for solving monotone linear complementarity problems‎ ‎over symmetric cones by using Euclidean Jordan algebra‎. ‎Two types of‎ ‎full NT-steps are used‎, ‎feasibility steps and centering steps‎. ‎The‎ ‎algorithm starts from strictly feasible iterates of a perturbed‎ ‎problem‎, ‎and, using the central path and feasi...

G. Moslehi and M. Mahnam,

While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

This paper addresses the Tardy/Lost penalty minimization with common due dates on a single machine. According to this performance measure, if the tardiness of a job exceeds a predefined value, the job will be lost and penalized by a fixed value. Initially, we present a 2-approximation algorithm and examine its worst case ratio bound. Then, a pseudo-polynomial dynamic programming algorithm is de...

A. Bozorgi Amiri, R. Rashid, S. M. Seyedhoseini,

Preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. In this paper, the same problem has been considered in which objective is to minimize the mean flow time. To prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. O...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید