Journal: :J. Intelligent Manufacturing 1995
Jan Riezebos Gerard J. C. Gaalman Jatinder N. D. Gupta

A scheduling system is proposed and developed for a special type of flow shop. In this flow shop there is one machine at each stage. A job may require multiple operations at each stage. The first operation of a job on stage j cannot start until the last operation of the job on stage j-1 has finished. Preemption of the operations of a job is not allowed. The flow shop that we consider has anothe...

Raviteja Buddala Siba Sankar Mahapatra

Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...

2009
Parviz Fattahi

Scheduling for the flexible job shop is very important in both fields of production management and combinatorial optimization. However, it quit difficult to achieve an optimal solution to this problem with traditional optimization approaches owing to the high computational complexity. The combining of several optimization criteria induces additional complexity and new problems. In this paper, a...

H.R Dehnar Saidy M.T Taghavi-Fard

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

2006
Tzung-Pei Hong Pei-Ying Huang Gwoboa Horng

In simple flow shop problems, each machine operation center includes just one machine. If at least one machine center includes more than one machine, the scheduling problem becomes a flexible flow-shop problem. Recently, group scheduling has also been proposed and discussed. In the group scheduling, each job belongs to a specific group and all the jobs are processed group by group. In this pape...

1998
John B. Chambers Wesley Barnes

In the classical job shop scheduling problem (JSSP), n jobs are processed to completion on m unrelated machines. Each job requires processing on each machine exactly once. For each job, technology constraints specify a complete, distinct routing which is fixed and known in advance. Processing times are sequence-independent, fixed, and known in advance. Each machine is continuously available fro...

Journal: :Computers & OR 2010
Abir Ben Hmida Mohamed Haouari Marie-José Huguet Pierre Lopez

The Flexible Job Shop scheduling Problem (FJSP) is a generalization of the classical Job Shop Problem in which each operation must be processed on a given machine chosen among a finite subset of candidate machines. The aim is to find an allocation for each operation and to define the sequence of operations on each machine so that the resulting schedule has a minimal completion time. We propose ...

Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...