نتایج جستجو برای: maintenance equipment

تعداد نتایج: 218264  

Journal: :DEStech Transactions on Computer Science and Engineering 2021

Journal: :Vestnik of Kazan State Agrarian University 2020

پایان نامه :وزارت علوم، تحقیقات و فناوری - دانشگاه صنعتی شریف - دانشکده مهندسی صنایع 1380

چکیده ندارد.

Journal: :بین المللی مهندسی صنایع و مدیریت تولید 0
robab hatami m.sc. graduate, industrial engineering department, isfahan university of technology ali zeinal hamadani associate professor,industrial engineering department, isfahan university of technology hamid reza karshenas assistant professor, department of electrical and computer engineering, isfahan university of technology mohammad hosein rohani m.sc. graduate, isfahan regional electric company

electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. high voltage circuit-breakers are an essential part of the power network. this study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. this mode...

2012
Malay Niraj Praveen Kumar

Malay Niraj, Praveen Kumar, Dr. A.Mishra Abstract -Present study is an approach for f inding the suitable maintenance practice and frequency of maintenance with the help of criticality factor of equipment it is based on failure mode evaluation and criticality analysis. Criticality means the failure probability of the equipment is very high. The miner failure of critical equipment may leads to s...

2015
Yantao Wang Xueshan Han

Abstract: Equipment maintenance is one of the core tasks in power system operations. The premise and foundation for maintenance is to establish a power equipment maintenance model, which should reflect all equipment states accurately including operation, inspection and maintenance. On the basis of the analysis of the traditional state diagram probability model, an improvement is put forward to ...

Journal: :Mathematical and Computer Modelling 2011
Ruey Huei Yeh Wen Liang Chang Hui-Chiung Lo

This paper investigates the optimal length of lease period and maintenance policy for leased equipment. In order to have steady revenue, the lessor (owner) of equipment may provide a discount to encourage the lessee (user) to sign a contract with a longer lease period. However, as the lease period increases, the maintenance cost also increases due to the deterioration or usage of the equipment....

Hatami, Robab , Karshenas, Hamid Reza , Rohani, Mohammad Hosein , Zeinal Hamadani, Ali ,

  Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید