The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. but, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. this paper considers the problem of scheduling no-idle hybrid flow shops. a mixed integer linear programming model is first developed to mathematically form...
Flexible job shop scheduling problem )FJSP( is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. FJSP is NP-hard and mainly presents two difficulties. The first one is to assign each operation to a machine out of a set of capable machines, and the second one deals with sequencing the assigned operations on the ma...
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
This paper investigates an unrelated parallel machine scheduling problem with a restrictive common due date. The objective is to minimize the total sum of earliness/tardiness costs. Using some properties such as V-Shaped property, optimizing start times machines, and no idle time between successive jobs, we propose effective construction-based heuristics local search algorithms for problem. var...
The mainstream architecture of a parallel machine with more than tens of processors is a distributed-memory machine. The bulk synchronous task scheduling problem (BSSP, for short) is an task scheduling problem for distributed-memory machines. This paper shows that there does not exist a ρ-approximation algorithm to solve the optimization counterpart of BSSP for any ρ < 6 5 unless P = NP .
چکیده ندارد.
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...